Silverstone Green Energy · EV charging site
Riverside Multi-storey Carpark
Cartlett Road, Haverfordwest, SA61 2LX
Riverside Multi-storey Carpark is an EV charging site in Haverfordwest, Pembrokeshire, run by Silverstone Green Energy. Both of its sockets are 22 kW Type 2. 9 other charging sites are listed within a mile, and the nearest site with 50 kW or more is County Hall Car Park, Haverfordwest (Dragon Charging), 0.2 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Silverstone Green Energy
- Opening hours
- Not published
- Access
- Public
- Payment
- Pay at the charger (from Open Charge Map)
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Riverside Multi-storey Carpark (Silverstone Green Energy)?
Up to 22 kW AC via Type 2.
How many charging sockets does Riverside Multi-storey Carpark (Silverstone Green Energy) have?
2 charging sockets: 1 × 22 kW Type 2, 1 × 22 kW Type 2.
Who operates Riverside Multi-storey Carpark?
Riverside Multi-storey Carpark is on the Silverstone Green Energy network.
Where is the nearest charger with 50 kW or more to Riverside Multi-storey Carpark (Silverstone Green Energy)?
County Hall Car Park, Haverfordwest (Dragon Charging) is 0.2 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Riverside Multi-storey Carpark (Silverstone Green Energy)?
A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Riverside Multi-storey Carpark (Silverstone Green Energy)?
A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Riverside Multi-storey Carpark (Silverstone Green Energy)?
A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- PMS Nissan
- County Hall Car Park, Haverfordwest
- Bridge Meadow Retail Park
- Haverfordwest High School
- Withybush Retail Park
- Pod Point Tesco Extra - Haverfordwest
- Cheapest nearby
- Pod Point Tesco Extra - Haverfordwest · 44.4p per kWh · 7 kW · 0.6 mi
- Fastest nearby
- Bridge Meadow Retail Park · 160 kW · 0.3 mi