Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

Be.EV · EV charging site

Soho Street

Soho Street, Bolton, BL1 1PE

Soho Street is an EV charging site in Bolton, Borough of Bolton, run by Be.EV and open 24 hours a day. Its 6 sockets reach up to 50 kW, with CCS and CHAdeMO at the top speed, and published prices run from £0.59 to £0.77 per kWh. Recorded live status shows it is usually busiest around 1 pm, and Amp Map measured 95% uptime and recorded 262 charging sessions here over the last 30 days. 7 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Bolton, Bolton Gate Retail Park (Source EV), 0.6 miles away.

Status

6 of 6 available

Checking status…

VerifiedLive status and details from Be.EV’s data feed. Amp Map updates them automatically.Last synced 21 Nov 2026

Connectors

CCS · 50 kW2 connectors · 77p per kWh2 free
BVRGM0002-1100% reliabilityAvailable
BVRGM0003-1100% reliabilityAvailable
CHAdeMO · 50 kW2 connectors · 77p per kWh2 free
BVRGM0002-286% reliabilityAvailable
BVRGM0003-287% reliabilityAvailable
Type 2 · 11 kW2 connectors · 59p per kWh2 free
BVRGM0002-3100% reliabilityAvailable
BVRGM0003-3100% reliabilityAvailable

Reliability is the share of time each socket was not out of order, over the last 30 days.

Site information

Operator
Be.EV
Opening hours
Open 24 hours
Parking
Car park
Payment
In the Be.EV appRFID card
Charger ID
BVRGM0002-1

Always check directly with the charge point operator for the most up-to-date information.

Prices

ConnectorPowerPrice
CCS50 kW77p per kWh
CHAdeMO50 kW77p per kWh
Type 211 kW59p per kWh

Price at the charger, including VAT. Paying in the operator's app may cost less.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 50 kW CCS~70 min · ≈ 55 kWh · ~£43
Tesla Model 3 Rear-Wheel Drive 10–80% · 50 kW CCS~50 min · ≈ 40 kWh · ~£31
Audi Q4 e-tron 50 10–80% · 50 kW CCS~66 min · ≈ 51 kWh · ~£39
Hyundai IONIQ 5 10–80% · 50 kW CCS~64 min · ≈ 51 kWh · ~£39
MG Motor MG4 Trophy 10–80% · 50 kW CCS~55 min · ≈ 43 kWh · ~£33
Hyundai Kona Electric Long Range 10–80% · 50 kW CCS~55 min · ≈ 41 kWh · ~£31
Nissan LEAF 10–80% · 50 kW CHAdeMO~55 min · ≈ 28 kWh · ~£22

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How much does it cost to charge at Soho Street (Be.EV)?

The listed price is CCS £0.77/kWh · CHAdeMO £0.77/kWh · Type 2 £0.59/kWh. Prices can change, so check the price at the charger before you start.

How fast is charging at Soho Street (Be.EV)?

Up to 50 kW DC via CCS, CHAdeMO, Type 2.

How many charging sockets does Soho Street (Be.EV) have?

6 charging sockets: 2 × 50 kW CCS, 2 × 50 kW CHAdeMO, 2 × 11 kW Type 2. Live per-socket availability is shown on this page.

Is Soho Street (Be.EV) open 24/7?

Yes - Soho Street (Be.EV) is open 24 hours a day, 7 days a week.

When is Soho Street (Be.EV) busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 1 pm and quietest around 6 am. The live status on this page shows what is free before you set off.

How reliable is Soho Street (Be.EV)?

Amp Map measured 95% uptime here from recorded live status over the last 30 days, across 262 observed charging sessions.

Who operates Soho Street?

Soho Street is on the Be.EV network.

Where is the nearest other charger with 50 kW or more to Soho Street (Be.EV)?

Bolton, Bolton Gate Retail Park (Source EV) is 0.6 miles away in a straight line, with up to 150 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at Soho Street (Be.EV)?

A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh (~£43 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Soho Street (Be.EV)?

A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh (~£31 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Soho Street (Be.EV)?

A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh (~£39 at the published price). Estimates assume a typical charge curve and a warm battery.

Data: Be.EV · synced 21 Nov 2026

Amp Map does not take payment. You pay the operator.