Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

Source EV · EV charging site

Abingdon, Milton gate

Milton Gate, Didcot, Ox14 4FP

Abingdon, Milton gate is an EV charging site in Didcot, Oxfordshire, run by Source EV and open 24 hours a day. All 8 of its sockets are 300 kW CCS, and the published price is £0.90 per kWh. Recorded live status shows it is usually busiest around 2 pm, and Amp Map measured 100% uptime and recorded 740 charging sessions here over the last 30 days. 7 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is McDonald's Didcot (InstaVolt Ltd), 170 yards away.

Status

8 of 8 available

Checking status…

VerifiedLive status and details from Source EV’s data feed. Amp Map updates them automatically.Last synced 21 Nov 2026

Connectors

CCS · 300 kW8 connectors · 90p per kWh8 free
SGB0162-CCS1100% reliabilityAvailable
SGB0162-CCS2100% reliabilityAvailable
SGB0162-CCS3100% reliabilityAvailable
SGB0162-CCS4100% reliabilityAvailable
SGB0163-CCS1100% reliabilityAvailable
SGB0163-CCS2100% reliabilityAvailable
SGB0163-CCS3100% reliabilityAvailable
SGB0163-CCS4100% reliabilityAvailable

Reliability is the share of time each socket was not out of order, over the last 30 days.

Site information

Operator
Source EV
Opening hours
Open 24 hours
Payment
Bank card at the chargerIn the SourceConnect appRFID card
Charger ID
SGB0162-CCS1

Always check directly with the charge point operator for the most up-to-date information.

Prices

ConnectorPowerPrice
CCS300 kW90p per kWh

Price at the charger, including VAT. Paying in the operator's app may cost less.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 300 kW CCS~21 min · ≈ 55 kWh · ~£50
Tesla Model 3 Rear-Wheel Drive 10–80% · 300 kW CCS~23 min · ≈ 40 kWh · ~£36
Audi Q4 e-tron 50 10–80% · 300 kW CCS~39 min · ≈ 51 kWh · ~£46
Hyundai IONIQ 5 10–80% · 300 kW CCS~18 min · ≈ 51 kWh · ~£46
MG Motor MG4 Trophy 10–80% · 300 kW CCS~30 min · ≈ 43 kWh · ~£38
Hyundai Kona Electric Long Range 10–80% · 300 kW CCS~39 min · ≈ 41 kWh · ~£37

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How much does it cost to charge at Abingdon, Milton gate (Source EV)?

The listed price is £0.90/kWh. Prices can change, so check the price at the charger before you start.

How fast is charging at Abingdon, Milton gate (Source EV)?

Up to 300 kW DC via CCS.

How many charging sockets does Abingdon, Milton gate (Source EV) have?

8 charging sockets: 8 × 300 kW CCS. Live per-socket availability is shown on this page.

Is Abingdon, Milton gate (Source EV) open 24/7?

Yes - Abingdon, Milton gate (Source EV) is open 24 hours a day, 7 days a week.

When is Abingdon, Milton gate (Source EV) busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 2 pm and quietest around 11 pm. The live status on this page shows what is free before you set off.

How reliable is Abingdon, Milton gate (Source EV)?

Amp Map measured 100% uptime here from recorded live status over the last 30 days, across 740 observed charging sessions.

Who operates Abingdon, Milton gate?

Abingdon, Milton gate is on the Source EV network.

Where is the nearest other charger with 50 kW or more to Abingdon, Milton gate (Source EV)?

McDonald's Didcot (InstaVolt Ltd) is 170 yards away in a straight line, with up to 120 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at Abingdon, Milton gate (Source EV)?

A typical 10–80% rapid charge takes about 21 min on the 300 kW CCS here, adding roughly 55 kWh (~£50 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Abingdon, Milton gate (Source EV)?

A typical 10–80% rapid charge takes about 23 min on the 300 kW CCS here, adding roughly 40 kWh (~£36 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Abingdon, Milton gate (Source EV)?

A typical 10–80% rapid charge takes about 39 min on the 300 kW CCS here, adding roughly 51 kWh (~£46 at the published price). Estimates assume a typical charge curve and a warm battery.

Data: Source EV · synced 21 Nov 2026

Amp Map does not take payment. You pay the operator.