Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

Source EV · EV charging site

Biggleswade, Normandy Lane

Normandy Lane, Biggleswade, SG18 8QB

Biggleswade, Normandy Lane is an EV charging site in Biggleswade, Central Bedfordshire (SG18 8QB), run by Source EV and open 24 hours a day. All 10 of its sockets are 150 kW CCS, and the published price is £0.90 per kWh. Recorded live status shows it is usually busiest around 1 pm, and Amp Map measured 100% uptime and recorded 150 charging sessions here over the last 30 days. Amp Map lists 1 other charge point named Biggleswade, Normandy Lane in Biggleswade. 1 other charging site is listed within a mile, and the nearest other site with 50 kW or more is Biggleswade, Normandy Lane (Source EV), 10 yards away.

Status

9 of 10 available

Checking status…

VerifiedLive status and details from Source EV’s data feed. Amp Map updates them automatically.Last synced 21 Nov 2026

Connectors

CCS · 150 kW10 connectors · 90p per kWh9 free1 in use
SGB0125-0198% reliabilityAvailable
SGB0125-02100% reliabilityAvailable
SGB0126-01100% reliabilityAvailable
SGB0126-02100% reliabilityAvailable
SGB0127-01100% reliabilityAvailable
SGB0127-02100% reliabilityAvailable
SGB0128-01100% reliabilityAvailable
SGB0128-02100% reliabilityAvailable
SGB0129-01100% reliabilityAvailable
SGB0129-02100% reliabilityCharging

Reliability is the share of time each socket was not out of order, over the last 30 days.

Site information

Operator
Source EV
Opening hours
Open 24 hours
Payment
Bank card at the chargerIn the SourceConnect appRFID card
Charger ID
SGB0125-01

Always check directly with the charge point operator for the most up-to-date information.

Prices

ConnectorPowerPrice
CCS150 kW90p per kWh

Price at the charger, including VAT. Paying in the operator's app may cost less.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 150 kW CCS~27 min · ≈ 55 kWh · ~£50
Tesla Model 3 Rear-Wheel Drive 10–80% · 150 kW CCS~24 min · ≈ 40 kWh · ~£36
Audi Q4 e-tron 50 10–80% · 150 kW CCS~39 min · ≈ 51 kWh · ~£46
Hyundai IONIQ 5 10–80% · 150 kW CCS~23 min · ≈ 51 kWh · ~£46
MG Motor MG4 Trophy 10–80% · 150 kW CCS~30 min · ≈ 43 kWh · ~£38
Hyundai Kona Electric Long Range 10–80% · 150 kW CCS~39 min · ≈ 41 kWh · ~£37

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How much does it cost to charge at Biggleswade, Normandy Lane (Source EV)?

The listed price is £0.90/kWh. Prices can change, so check the price at the charger before you start.

How fast is charging at Biggleswade, Normandy Lane (Source EV)?

Up to 150 kW DC via CCS.

How many charging sockets does Biggleswade, Normandy Lane (Source EV) have?

10 charging sockets: 10 × 150 kW CCS. Live per-socket availability is shown on this page.

Is Biggleswade, Normandy Lane (Source EV) open 24/7?

Yes - Biggleswade, Normandy Lane (Source EV) is open 24 hours a day, 7 days a week.

When is Biggleswade, Normandy Lane (Source EV) busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 1 pm and quietest around 9 pm. The live status on this page shows what is free before you set off.

How reliable is Biggleswade, Normandy Lane (Source EV)?

Amp Map measured 100% uptime here from recorded live status over the last 30 days, across 150 observed charging sessions.

Who operates Biggleswade, Normandy Lane?

Biggleswade, Normandy Lane is on the Source EV network.

Where is the nearest other charger with 50 kW or more to Biggleswade, Normandy Lane (Source EV)?

Biggleswade, Normandy Lane (Source EV) is 10 yards away in a straight line, with up to 150 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at Biggleswade, Normandy Lane (Source EV)?

A typical 10–80% rapid charge takes about 27 min on the 150 kW CCS here, adding roughly 55 kWh (~£50 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Biggleswade, Normandy Lane (Source EV)?

A typical 10–80% rapid charge takes about 24 min on the 150 kW CCS here, adding roughly 40 kWh (~£36 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Biggleswade, Normandy Lane (Source EV)?

A typical 10–80% rapid charge takes about 39 min on the 150 kW CCS here, adding roughly 51 kWh (~£46 at the published price). Estimates assume a typical charge curve and a warm battery.

Data: Source EV · synced 21 Nov 2026

Amp Map does not take payment. You pay the operator.