Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

Source EV · EV charging site

Hednesford, Belt Road

387 Cannock Road, WS11 5TD

Hednesford, Belt Road is an EV charging site in Cannock, Staffordshire, run by Source EV and open 24 hours a day. Its 4 sockets reach up to 150 kW, with CCS at the top speed, and the published price is £0.90 per kWh. Recorded live status shows it is usually busiest around 3 pm, and Amp Map measured 100% uptime and recorded 214 charging sessions here over the last 30 days. 2 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Victoria Shopping Park (POGO), 0.4 miles away.

Status

2 of 4 available

Checking status…

VerifiedLive status and details from Source EV’s data feed. Amp Map updates them automatically.Last synced 21 Nov 2026

Connectors

CCS · 150 kW3 connectors · 90p per kWh1 free2 in use
SGB0073-01100% reliabilityAvailable
SGB0073-02100% reliabilityCharging
SGB0074-01100% reliabilityCharging
CHAdeMO · 100 kW1 connector · 90p per kWh1 free
SGB0074-02100% reliabilityAvailable

Reliability is the share of time each socket was not out of order, over the last 30 days.

Site information

Operator
Source EV
Opening hours
Open 24 hours
Payment
Bank card at the chargerIn the SourceConnect appRFID card
Charger ID
SGB0073-01

Always check directly with the charge point operator for the most up-to-date information.

Prices

ConnectorPowerPrice
CCS150 kW90p per kWh
CHAdeMO100 kW90p per kWh

Price at the charger, including VAT. Paying in the operator's app may cost less.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 150 kW CCS~27 min · ≈ 55 kWh · ~£50
Tesla Model 3 Rear-Wheel Drive 10–80% · 150 kW CCS~24 min · ≈ 40 kWh · ~£36
Audi Q4 e-tron 50 10–80% · 150 kW CCS~39 min · ≈ 51 kWh · ~£46
Hyundai IONIQ 5 10–80% · 150 kW CCS~23 min · ≈ 51 kWh · ~£46
MG Motor MG4 Trophy 10–80% · 150 kW CCS~30 min · ≈ 43 kWh · ~£38
Hyundai Kona Electric Long Range 10–80% · 150 kW CCS~39 min · ≈ 41 kWh · ~£37
Nissan LEAF 10–80% · 100 kW CHAdeMO~54 min · ≈ 28 kWh · ~£25

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How much does it cost to charge at Hednesford, Belt Road (Source EV)?

The listed price is £0.90/kWh. Prices can change, so check the price at the charger before you start.

How fast is charging at Hednesford, Belt Road (Source EV)?

Up to 150 kW DC via CCS, CHAdeMO.

How many charging sockets does Hednesford, Belt Road (Source EV) have?

4 charging sockets: 3 × 150 kW CCS, 1 × 100 kW CHAdeMO. Live per-socket availability is shown on this page.

Is Hednesford, Belt Road (Source EV) open 24/7?

Yes - Hednesford, Belt Road (Source EV) is open 24 hours a day, 7 days a week.

When is Hednesford, Belt Road (Source EV) busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 3 pm and quietest around 9 pm. The live status on this page shows what is free before you set off.

How reliable is Hednesford, Belt Road (Source EV)?

Amp Map measured 100% uptime here from recorded live status over the last 30 days, across 214 observed charging sessions.

Who operates Hednesford, Belt Road?

Hednesford, Belt Road is on the Source EV network.

Where is the nearest other charger with 50 kW or more to Hednesford, Belt Road (Source EV)?

Victoria Shopping Park (POGO) is 0.4 miles away in a straight line, with up to 150 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at Hednesford, Belt Road (Source EV)?

A typical 10–80% rapid charge takes about 27 min on the 150 kW CCS here, adding roughly 55 kWh (~£50 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Hednesford, Belt Road (Source EV)?

A typical 10–80% rapid charge takes about 24 min on the 150 kW CCS here, adding roughly 40 kWh (~£36 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Hednesford, Belt Road (Source EV)?

A typical 10–80% rapid charge takes about 39 min on the 150 kW CCS here, adding roughly 51 kWh (~£46 at the published price). Estimates assume a typical charge curve and a warm battery.

Data: Source EV · synced 21 Nov 2026

Amp Map does not take payment. You pay the operator.