# Spurn Point

Web page: https://ampmap.co.uk/charger/spurn-point-uk

Spurn Point is an EV charging site in Cleethorpes, North East Lincolnshire. It has a single 7 kW Type 2 socket, and the price is listed as 25p/kWh paid in cafe on finish.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Area:** Cleethorpes, North East Lincolnshire, United Kingdom
- **Coordinates (latitude, longitude):** 53.62009, 0.13948
- **Getting there:** 2x 7kw Type 2. Important: Ask in cafe for RFID card, DO NOT connect cable to either end until card tapped on reader! Return card to cafe and repeat process to disconnect. Cost 25p/kWh, note kWh used from unit and pay in cafe when finished. Bit of a faff. Good cake though.

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| Type 2 | 7 kW | 2 | Not listed |

- **Price:** 25p/kWh paid in cafe on finish (from Open Charge Map)

## Site information

- **Opening hours:** Not published
- **Access:** Private · notice required
- **Notes:** Car park open dawn until dusk. The Spurn Discovery Centre is open 09:00 - 17:00 (16:00 in winter), with the cafe open 10:00 - 16:00 (15:00 in winter).

## Common questions

### How much does it cost to charge at Spurn Point?

The listed price is 25p/kWh paid in cafe on finish. Prices can change, so check the price at the charger before you start.

### How fast is charging at Spurn Point?

Up to 7 kW AC via Type 2.

### How many charging sockets does Spurn Point have?

1 charging socket: 2 × 7 kW Type 2.

### Can anyone charge at Spurn Point?

The operator lists this charger as private - access is restricted.

### How long does a Tesla Model Y Long Range take to charge at Spurn Point?

A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Spurn Point?

A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Spurn Point?

A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Cleethorpes](https://ampmap.co.uk/chargers/united-kingdom/north-east-lincolnshire/cleethorpes)

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/spurn-point-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 11 Oct 2020).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
