Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

EV charging site

Starbuck Ruscote Avenue

Ruscote Avenue, Banbury, OX16 2QN

Starbuck Ruscote Avenue is an EV charging site in Banbury, Oxfordshire. All 6 of its sockets are 160 kW CCS. 10 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Banbury, Starbucks DC Forecourt, 10 yards away.

Status

No live status

We don't have live status for this charger. Check it when you arrive.

Community dataThird-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.Last verified 12 Apr 2026Last verified 12 Apr 2026

Connectors

CCS · 160 kW6 connectors

Site information

Opening hours
Not published
Access
Public · membership required · access key required

Always check directly with the charge point operator for the most up-to-date information.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 160 kW CCS~26 min
Tesla Model 3 Rear-Wheel Drive 10–80% · 160 kW CCS~23 min
Audi Q4 e-tron 50 10–80% · 160 kW CCS~39 min
Hyundai IONIQ 5 10–80% · 160 kW CCS~22 min
MG Motor MG4 Trophy 10–80% · 160 kW CCS~30 min
Hyundai Kona Electric Long Range 10–80% · 160 kW CCS~39 min

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How fast is charging at Starbuck Ruscote Avenue?

Up to 160 kW DC via CCS.

How many charging sockets does Starbuck Ruscote Avenue have?

6 charging sockets: 6 × 160 kW CCS.

Where is the nearest other charger with 50 kW or more to Starbuck Ruscote Avenue?

Banbury, Starbucks DC Forecourt is 10 yards away in a straight line, with up to 150 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at Starbuck Ruscote Avenue?

A typical 10–80% rapid charge takes about 26 min on the 160 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Starbuck Ruscote Avenue?

A typical 10–80% rapid charge takes about 23 min on the 160 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Starbuck Ruscote Avenue?

A typical 10–80% rapid charge takes about 39 min on the 160 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

Data: Open Charge Map · verified 12 Apr 2026

Amp Map does not take payment. You pay the operator.