Stoke Lodge Hotel · EV charging site
Stoke Lodge Hotel
Cinders Ln, Brixham, TQ6 0RA
Stoke Lodge Hotel is an EV charging site in Brixham, Borough of Torbay, run by Stoke Lodge Hotel and open 24 hours a day. Both of its sockets are 7 kW Type 2. Amp Map measured 100% uptime here over the last 5 days. No other charging site is listed within a mile, and the nearest site with 50 kW or more is Shell Recharge EV Aldi Paignton, 6.5 miles away.
Status
2 of 2 available
Checking status…
Connectors
Type 2 · 7 kW
Reliability is the share of time each socket was not out of order, over the last 5 days.
Site information
- Operator
- Stoke Lodge Hotel
- Opening hours
- Open 24 hours
- Payment
- In the operator's appRFID card
- Charger ID
- Hand Socket
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Stoke Lodge Hotel?
Up to 7 kW AC via Type 2.
How many charging sockets does Stoke Lodge Hotel have?
2 charging sockets: 2 × 7 kW Type 2. Live per-socket availability is shown on this page.
Is Stoke Lodge Hotel open 24/7?
Yes - Stoke Lodge Hotel is open 24 hours a day, 7 days a week.
How reliable is Stoke Lodge Hotel?
Amp Map measured 100% uptime here from recorded live status over the last 5 days.
Who operates Stoke Lodge Hotel?
Stoke Lodge Hotel is on the Stoke Lodge Hotel network.
Where is the nearest charger with 50 kW or more to Stoke Lodge Hotel?
Shell Recharge EV Aldi Paignton is 6.5 miles away in a straight line, with up to 150 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Stoke Lodge Hotel?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Stoke Lodge Hotel?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Stoke Lodge Hotel?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Restricted Access Chargers - SW Devon
- Restricted Access Chargers - SW Devon
- Frogwell B&B
- Mayors Avenue
- Whitebeam Wood Holiday Home
- Pod Point Woodlands Family Theme Park
- Cheapest nearby
- Pod Point Woodlands Family Theme Park · 49.2p per kWh · 7 kW · 3.9 mi
- Fastest nearby
- Mayors Avenue · 22 kW · 2.1 mi