Biscay Road is an EV charging site in Shepherds Bush, Greater London (W6 8JT), run by SureCharge. It has a single 4 kW Type 2 socket. Amp Map lists 3 other charge points named Biscay Road in Shepherds Bush. 1,604 other charging sites are listed within a mile, and the nearest site with 50 kW or more is bp Hammersmith Flyover (BP Pulse), 0.2 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- SureCharge
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Phone (from Open Charge Map)
- +44 1732 600 700
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Biscay Road (SureCharge)?
Up to 4 kW AC via Type 2.
How many charging sockets does Biscay Road (SureCharge) have?
1 charging socket: 1 × 4 kW Type 2.
Who operates Biscay Road?
Biscay Road is on the SureCharge network. For site issues, the operator lists +44 1732 600 700.
Where is the nearest charger with 50 kW or more to Biscay Road (SureCharge)?
bp Hammersmith Flyover (BP Pulse) is 0.2 miles away in a straight line, with up to 300 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Biscay Road (SureCharge)?
A 10–80% charge takes about 13h 50m on the 4 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Biscay Road (SureCharge)?
A 10–80% charge takes about 9h 59m on the 4 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Biscay Road (SureCharge)?
A 10–80% charge takes about 12h 46m on the 4 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- ubitricity Distributed Energy Systems UK Ltd. 4 Biscay Road, Outside 4
- ubitricity Distributed Energy Systems UK Ltd. 20 Biscay Road, Outside No 20
- ubitricity Distributed Energy Systems UK Ltd. 12 Yeldham Road, Outside 12
- Yeldham Road
- ubitricity Distributed Energy Systems UK Ltd. 2 Beryl Road, Outside 2
- ubitricity Distributed Energy Systems UK Ltd. 22 Beryl Road
- Cheapest nearby
- ubitricity Distributed Energy Systems UK Ltd. 4 Biscay Road, Outside 4 · 56p per kWh · 5 kW · 10 yd
- Fastest nearby
- ubitricity Distributed Energy Systems UK Ltd. 4 Biscay Road, Outside 4 · 5 kW · 10 yd