SureCharge · EV charging site
Bradmore Park Road
Bradmore Park Road, Shepherds Bush, W6 0DT
Bradmore Park Road is an EV charging site in Shepherds Bush, Greater London (W6 0DT), run by SureCharge. It has a single 5 kW Type 2 socket. Amp Map lists 2 other charge points named Bradmore Park Road in Shepherds Bush. 1,611 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Cromwell Road South SF Connect (BP Pulse), 0.4 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- SureCharge
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Phone (from Open Charge Map)
- +44 1732 600 700
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Bradmore Park Road (SureCharge)?
Up to 5 kW AC via Type 2.
How many charging sockets does Bradmore Park Road (SureCharge) have?
1 charging socket: 1 × 5 kW Type 2.
Who operates Bradmore Park Road?
Bradmore Park Road is on the SureCharge network. For site issues, the operator lists +44 1732 600 700.
Where is the nearest charger with 50 kW or more to Bradmore Park Road (SureCharge)?
Cromwell Road South SF Connect (BP Pulse) is 0.4 miles away in a straight line, with up to 300 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Bradmore Park Road (SureCharge)?
A 10–80% charge takes about 11h 4m on the 5 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Bradmore Park Road (SureCharge)?
A 10–80% charge takes about 7h 59m on the 5 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Bradmore Park Road (SureCharge)?
A 10–80% charge takes about 10h 13m on the 5 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- ubitricity Distributed Energy Systems UK Ltd. 15 Bradmore Park Road, O S No 15
- ubitricity Distributed Energy Systems UK Ltd. 16 Perrers Road, O S 16
- ubitricity Distributed Energy Systems UK Ltd. Road Atwood, South F W Opp Perrers Road
- Banim Street
- ubitricity Distributed Energy Systems UK Ltd. 15 Perrers Road, Outside No 15
- ubitricity Distributed Energy Systems UK Ltd. 39 Banim Street, Outside 39
- Cheapest nearby
- ubitricity Distributed Energy Systems UK Ltd. 15 Bradmore Park Road, O S No 15 · 67p per kWh · 5 kW · 10 yd