SureCharge · EV charging site
Burton Road
Burton Road, Surbiton, KT2 5TF
Burton Road is an EV charging site in Surbiton, Greater London (KT2 5TF), run by SureCharge. It has a single 4 kW Type 2 socket. Amp Map lists 2 other charge points named Burton Road in Surbiton. 219 other charging sites are listed within a mile, and the nearest site with 50 kW or more is London, UK - Kingston Upon Thames (Tesla), 0.5 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- SureCharge
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Phone (from Open Charge Map)
- +44 1732 600 700
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Burton Road (SureCharge)?
Up to 4 kW AC via Type 2.
How many charging sockets does Burton Road (SureCharge) have?
1 charging socket: 1 × 4 kW Type 2.
Who operates Burton Road?
Burton Road is on the SureCharge network. For site issues, the operator lists +44 1732 600 700.
Where is the nearest charger with 50 kW or more to Burton Road (SureCharge)?
London, UK - Kingston Upon Thames (Tesla) is 0.5 miles away in a straight line, with up to 250 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Burton Road (SureCharge)?
A 10–80% charge takes about 13h 50m on the 4 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Burton Road (SureCharge)?
A 10–80% charge takes about 9h 59m on the 4 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Burton Road (SureCharge)?
A 10–80% charge takes about 12h 46m on the 4 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- ubitricity Distributed Energy Systems UK Ltd. Road Burton, Opposite Church
- ubitricity Distributed Energy Systems UK Ltd. Road Burton, Opp St Lukes Church
- ubitricity Distributed Energy Systems UK Ltd. 69 Burton Road, S O 69 Richmond Park Road
- Burton Road
- Gibbon Road
- Highclere Road
- Cheapest nearby
- ubitricity Distributed Energy Systems UK Ltd. Road Burton, Opposite Church · 67p per kWh · 5 kW · 10 yd
- Fastest nearby
- ubitricity Distributed Energy Systems UK Ltd. Road Burton, Opposite Church · 5 kW · 10 yd