SureCharge · EV charging site
Dorville Crescent
Dorville Crescent, Shepherds Bush, W6 0HJ
Dorville Crescent is an EV charging site in Shepherds Bush, Greater London (W6 0HJ), run by SureCharge. It has a single 5 kW Type 2 socket. Amp Map lists 2 other charge points named Dorville Crescent in Shepherds Bush. 1,525 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Cromwell Road South SF Connect (BP Pulse), 0.5 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- SureCharge
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Phone (from Open Charge Map)
- +44 1732 600 700
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Dorville Crescent (SureCharge)?
Up to 5 kW AC via Type 2.
How many charging sockets does Dorville Crescent (SureCharge) have?
1 charging socket: 1 × 5 kW Type 2.
Who operates Dorville Crescent?
Dorville Crescent is on the SureCharge network. For site issues, the operator lists +44 1732 600 700.
Where is the nearest charger with 50 kW or more to Dorville Crescent (SureCharge)?
Cromwell Road South SF Connect (BP Pulse) is 0.5 miles away in a straight line, with up to 300 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Dorville Crescent (SureCharge)?
A 10–80% charge takes about 11h 4m on the 5 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Dorville Crescent (SureCharge)?
A 10–80% charge takes about 7h 59m on the 5 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Dorville Crescent (SureCharge)?
A 10–80% charge takes about 10h 13m on the 5 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- ubitricity Distributed Energy Systems UK Ltd. 9 Wellesley Avenue, Outside No 9
- ubitricity Distributed Energy Systems UK Ltd. 44 Wingate Road, O S No 44
- Dorville Crescent
- ubitricity Distributed Energy Systems UK Ltd. 29 Dorville Crescent, Outside 29
- Wellesley Avenue
- ubitricity Distributed Energy Systems UK Ltd. 151 Wellesley Avenue, Outside 151
- Cheapest nearby
- ubitricity Distributed Energy Systems UK Ltd. 9 Wellesley Avenue, Outside No 9 · 67p per kWh · 5 kW · 10 yd