SureCharge · EV charging site
Fernhurst Road
Fernhurst Road, Fulham, SW6 7JN
Fernhurst Road is an EV charging site in Fulham, Greater London (SW6 7JN), run by SureCharge. It has a single 4 kW Type 2 socket. Amp Map lists 1 other charge point named Fernhurst Road in Fulham. 1,570 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Shell Recharge Shell Fulham, 0.4 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- SureCharge
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Phone (from Open Charge Map)
- +44 1732 600 700
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Fernhurst Road (SureCharge)?
Up to 4 kW AC via Type 2.
How many charging sockets does Fernhurst Road (SureCharge) have?
1 charging socket: 1 × 4 kW Type 2.
Who operates Fernhurst Road?
Fernhurst Road is on the SureCharge network. For site issues, the operator lists +44 1732 600 700.
Where is the nearest charger with 50 kW or more to Fernhurst Road (SureCharge)?
Shell Recharge Shell Fulham is 0.4 miles away in a straight line, with up to 175 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Fernhurst Road (SureCharge)?
A 10–80% charge takes about 13h 50m on the 4 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Fernhurst Road (SureCharge)?
A 10–80% charge takes about 9h 59m on the 4 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Fernhurst Road (SureCharge)?
A 10–80% charge takes about 12h 46m on the 4 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- ubitricity Distributed Energy Systems UK Ltd. Road Fernhurst, J W Filmer Road
- ubitricity Distributed Energy Systems UK Ltd. 39 Filmer Road, Outside 39
- ubitricity Distributed Energy Systems UK Ltd. 34 Filmer Road, Outside 34
- ubitricity Distributed Energy Systems UK Ltd. 21 Fernhurst Road, Outside 21
- Fernhurst Road
- ubitricity Distributed Energy Systems UK Ltd. 132 Bishops Road, Opposite 132
- Cheapest nearby
- ubitricity Distributed Energy Systems UK Ltd. Road Fernhurst, J W Filmer Road · 67p per kWh · 5 kW · 10 yd
- Fastest nearby
- ubitricity Distributed Energy Systems UK Ltd. Road Fernhurst, J W Filmer Road · 5 kW · 10 yd