SureCharge · EV charging site
Hereford Way
Hereford Way, Hook, KT9 2QH
Hereford Way is an EV charging site in Hook, Greater London, run by SureCharge. It has a single 4 kW Type 2 socket. 35 other charging sites are listed within a mile, and the nearest site with 50 kW or more is North Parade (BP Pulse), 0.6 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- SureCharge
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Phone (from Open Charge Map)
- +44 1732 600 700
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Hereford Way (SureCharge)?
Up to 4 kW AC via Type 2.
How many charging sockets does Hereford Way (SureCharge) have?
1 charging socket: 1 × 4 kW Type 2.
Who operates Hereford Way?
Hereford Way is on the SureCharge network. For site issues, the operator lists +44 1732 600 700.
Where is the nearest charger with 50 kW or more to Hereford Way (SureCharge)?
North Parade (BP Pulse) is 0.6 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Hereford Way (SureCharge)?
A 10–80% charge takes about 13h 50m on the 4 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Hereford Way (SureCharge)?
A 10–80% charge takes about 9h 59m on the 4 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Hereford Way (SureCharge)?
A 10–80% charge takes about 12h 46m on the 4 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- ubitricity Distributed Energy Systems UK Ltd. 1A Hereford Way, Opposite No 1A
- ubitricity Distributed Energy Systems UK Ltd. 2-24 Ripon Gardens, Side Of 2-24
- Ripon Gardens
- ubitricity Distributed Energy Systems UK Ltd. 33 Ripon Gardens, Outside 33
- ubitricity Distributed Energy Systems UK Ltd. 6 Stormont Way, Outside 6
- Stormont Way
- Cheapest nearby
- ubitricity Distributed Energy Systems UK Ltd. 1A Hereford Way, Opposite No 1A · 56p per kWh · 5 kW · 10 yd
- Fastest nearby
- ubitricity Distributed Energy Systems UK Ltd. 1A Hereford Way, Opposite No 1A · 5 kW · 10 yd