SureCharge · EV charging site
Langthorne Street
Holberton Gardens, Fulham, SW6 6JY
Langthorne Street is an EV charging site at Holberton Gardens in Fulham, Greater London, run by SureCharge. It has a single 5 kW Type 2 socket. Amp Map lists 3 other charge points named Langthorne Street in Fulham. 1,365 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Lille Road (Normand Park layby) (ESB Energy), 0.6 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- SureCharge
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Phone (from Open Charge Map)
- +44 1732 600 700
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Langthorne Street (SureCharge)?
Up to 5 kW AC via Type 2.
How many charging sockets does Langthorne Street (SureCharge) have?
1 charging socket: 1 × 5 kW Type 2.
Who operates Langthorne Street?
Langthorne Street is on the SureCharge network. For site issues, the operator lists +44 1732 600 700.
Where is the nearest charger with 50 kW or more to Langthorne Street (SureCharge)?
Lille Road (Normand Park layby) (ESB Energy) is 0.6 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Langthorne Street (SureCharge)?
A 10–80% charge takes about 11h 4m on the 5 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Langthorne Street (SureCharge)?
A 10–80% charge takes about 7h 59m on the 5 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Langthorne Street (SureCharge)?
A 10–80% charge takes about 10h 13m on the 5 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- ubitricity Distributed Energy Systems UK Ltd. 26 Langthorne Street, Outside 26
- ubitricity Distributed Energy Systems UK Ltd. 46 Langthorne Street, Outside 46
- ubitricity Distributed Energy Systems UK Ltd. 2 Langthorne Street, O S 2
- Langthorne Street
- Kenyon Street
- ubitricity Distributed Energy Systems UK Ltd. 11 Kenyon Street, Outside No 11
- Cheapest nearby
- ubitricity Distributed Energy Systems UK Ltd. 26 Langthorne Street, Outside 26 · 67p per kWh · 5 kW · 10 yd