Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

SureCharge · EV charging site

Melrose Avenue

Melrose Avenue, New Malden, KT3 3HQ

Melrose Avenue is an EV charging site in New Malden, Greater London, run by SureCharge. It has a single 5 kW Type 2 socket. 108 other charging sites are listed within a mile, and the nearest site with 50 kW or more is 1 Cambridge Road (BP Pulse), 0.3 miles away.

Status

No live status

We don't have live status for this charger. Check it when you arrive.

Community dataThird-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.Last verified 8 Mar 2023Last verified 8 Mar 2023

Connectors

Type 2 · 5 kW1 connector

Site information

Operator
SureCharge
Opening hours
Not published
Access
Public · membership required · access key required
Phone (from Open Charge Map)
+44 1732 600 700

Always check directly with the charge point operator for the most up-to-date information.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 5 kW Type 2~11h 4m
Tesla Model 3 Rear-Wheel Drive 10–80% · 5 kW Type 2~7h 59m
Audi Q4 e-tron 50 10–80% · 5 kW Type 2~10h 13m
Hyundai IONIQ 5 10–80% · 5 kW Type 2~10h 10m
MG Motor MG4 Trophy 10–80% · 5 kW Type 2~8h 32m
Hyundai Kona Electric Long Range 10–80% · 5 kW Type 2~8h 7m
Nissan LEAF 10–80% · 5 kW Type 2~5h 36m

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How fast is charging at Melrose Avenue (SureCharge)?

Up to 5 kW AC via Type 2.

How many charging sockets does Melrose Avenue (SureCharge) have?

1 charging socket: 1 × 5 kW Type 2.

Who operates Melrose Avenue?

Melrose Avenue is on the SureCharge network. For site issues, the operator lists +44 1732 600 700.

Where is the nearest charger with 50 kW or more to Melrose Avenue (SureCharge)?

1 Cambridge Road (BP Pulse) is 0.3 miles away in a straight line, with up to 50 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at Melrose Avenue (SureCharge)?

A 10–80% charge takes about 11h 4m on the 5 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Melrose Avenue (SureCharge)?

A 10–80% charge takes about 7h 59m on the 5 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Melrose Avenue (SureCharge)?

A 10–80% charge takes about 10h 13m on the 5 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

Data: Open Charge Map · verified 8 Mar 2023

Amp Map does not take payment. You pay the operator.