SureCharge · EV charging site
Orme Road
Orme Road, New Malden, KT1 3SB
Orme Road is an EV charging site in New Malden, Greater London, run by SureCharge. It has a single 5 kW Type 2 socket. 192 other charging sites are listed within a mile, and the nearest site with 50 kW or more is The Triangle (BP Pulse), 100 yards away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- SureCharge
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Phone (from Open Charge Map)
- +44 1732 600 700
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Orme Road (SureCharge)?
Up to 5 kW AC via Type 2.
How many charging sockets does Orme Road (SureCharge) have?
1 charging socket: 1 × 5 kW Type 2.
Who operates Orme Road?
Orme Road is on the SureCharge network. For site issues, the operator lists +44 1732 600 700.
Where is the nearest charger with 50 kW or more to Orme Road (SureCharge)?
The Triangle (BP Pulse) is 100 yards away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Orme Road (SureCharge)?
A 10–80% charge takes about 11h 4m on the 5 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Orme Road (SureCharge)?
A 10–80% charge takes about 7h 59m on the 5 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Orme Road (SureCharge)?
A 10–80% charge takes about 10h 13m on the 5 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- ubitricity Distributed Energy Systems UK Ltd. 104 Orme Road, Outside 104
- The Triangle
- King Henrys Road
- ubitricity Distributed Energy Systems UK Ltd. 66 King Henrys Road, Side Of 66
- Porchester Road
- ubitricity Distributed Energy Systems UK Ltd. 91 Porchester Road, Opposite 91
- Cheapest nearby
- ubitricity Distributed Energy Systems UK Ltd. 104 Orme Road, Outside 104 · 56p per kWh · 5 kW · 10 yd
- Fastest nearby
- The Triangle · 50 kW · 100 yd