SureCharge · EV charging site
Quarrendon Street
Quarrendon Street, Fulham, SW6 3ST
Quarrendon Street is an EV charging site in Fulham, Greater London (SW6 3ST), run by SureCharge. It has a single 5 kW Type 2 socket. Amp Map lists 1 other charge point named Quarrendon Street in Fulham. 1,133 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Sainsburys Fulham Wharf (Smart Charge by Sainsbury's), 0.6 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- SureCharge
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Phone (from Open Charge Map)
- +44 1732 600 700
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Quarrendon Street (SureCharge)?
Up to 5 kW AC via Type 2.
How many charging sockets does Quarrendon Street (SureCharge) have?
1 charging socket: 1 × 5 kW Type 2.
Who operates Quarrendon Street?
Quarrendon Street is on the SureCharge network. For site issues, the operator lists +44 1732 600 700.
Where is the nearest charger with 50 kW or more to Quarrendon Street (SureCharge)?
Sainsburys Fulham Wharf (Smart Charge by Sainsbury's) is 0.6 miles away in a straight line, with up to 150 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Quarrendon Street (SureCharge)?
A 10–80% charge takes about 11h 4m on the 5 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Quarrendon Street (SureCharge)?
A 10–80% charge takes about 7h 59m on the 5 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Quarrendon Street (SureCharge)?
A 10–80% charge takes about 10h 13m on the 5 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- ubitricity Distributed Energy Systems UK Ltd. 31 Quarrendon Street, Outside No 31
- ubitricity Distributed Energy Systems UK Ltd. 31 Chiddingstone Street, Outside 31
- ubitricity Distributed Energy Systems UK Ltd. 42 Chipstead Street, Outside 42
- Chipstead Street
- Chiddingstone Street
- ubitricity Distributed Energy Systems UK Ltd. 13 Chiddingstone Street, Outside No 13
- Cheapest nearby
- ubitricity Distributed Energy Systems UK Ltd. 31 Quarrendon Street, Outside No 31 · 56p per kWh · 5 kW · 10 yd