SureCharge · EV charging site
Queen Caroline Street
Queen Caroline Street, Shepherds Bush, W6 9BT
Queen Caroline Street is an EV charging site in Shepherds Bush, Greater London (W6 9BT), run by SureCharge. It has a single 5 kW Type 2 socket. Amp Map lists 2 other charge points named Queen Caroline Street in Shepherds Bush. 1,453 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Sussex Place (ESB Energy), 0.2 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- SureCharge
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Phone (from Open Charge Map)
- +44 1732 600 700
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Queen Caroline Street (SureCharge)?
Up to 5 kW AC via Type 2.
How many charging sockets does Queen Caroline Street (SureCharge) have?
1 charging socket: 1 × 5 kW Type 2.
Who operates Queen Caroline Street?
Queen Caroline Street is on the SureCharge network. For site issues, the operator lists +44 1732 600 700.
Where is the nearest charger with 50 kW or more to Queen Caroline Street (SureCharge)?
Sussex Place (ESB Energy) is 0.2 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Queen Caroline Street (SureCharge)?
A 10–80% charge takes about 11h 4m on the 5 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Queen Caroline Street (SureCharge)?
A 10–80% charge takes about 7h 59m on the 5 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Queen Caroline Street (SureCharge)?
A 10–80% charge takes about 10h 13m on the 5 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- ubitricity Distributed Energy Systems UK Ltd. 164 Macbeth Road, Opposite 164
- ubitricity Distributed Energy Systems UK Ltd. Road Macbeth, Opposite School
- ubitricity Distributed Energy Systems UK Ltd. 4 Riverside Gardens, On Col 4
- Riverside Gardens
- ubitricity Distributed Energy Systems UK Ltd. Place Down, Opposite Aspen Gardens
- Down Place
- Cheapest nearby
- ubitricity Distributed Energy Systems UK Ltd. 164 Macbeth Road, Opposite 164 · 67p per kWh · 5 kW · 20 yd