# St Andrews Square · SureCharge

Web page: https://ampmap.co.uk/charger/surecharge-st-andrews-square-2-uk

St Andrews Square is an EV charging site in Surbiton, Greater London, run by SureCharge. It has a single 5 kW Type 2 socket.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** St Andrews Square, KT6 4AJ
- **Area:** Surbiton, Greater London, United Kingdom
- **Coordinates (latitude, longitude):** 51.39324, -0.30969

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| Type 2 | 5 kW | 1 | Not listed |

## Site information

- **Operator:** SureCharge
- **Opening hours:** Not published
- **Access:** Public · membership required · access key required

## Common questions

### How fast is charging at St Andrews Square (SureCharge)?

Up to 5 kW AC via Type 2.

### How many charging sockets does St Andrews Square (SureCharge) have?

1 charging socket: 1 × 5 kW Type 2.

### Who operates St Andrews Square?

St Andrews Square is on the SureCharge network. For site issues, the operator lists +44 1732 600 700.

### How long does a Tesla Model Y Long Range take to charge at St Andrews Square (SureCharge)?

A 10–80% charge takes about 11h 4m on the 5 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at St Andrews Square (SureCharge)?

A 10–80% charge takes about 7h 59m on the 5 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at St Andrews Square (SureCharge)?

A 10–80% charge takes about 10h 13m on the 5 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Surbiton](https://ampmap.co.uk/chargers/united-kingdom/greater-london/surbiton)
- [Cheapest charging in Surbiton](https://ampmap.co.uk/chargers/united-kingdom/greater-london/surbiton/cheapest)
- [SureCharge chargers](https://ampmap.co.uk/networks/surecharge)

## Chargers near this site

- [ubitricity Distributed Energy Systems UK Ltd. 1 St Andrews Square](https://ampmap.co.uk/charger/surecharge-st-andrews-square-uk) - Ubitricity · Type 2 5 kW · 1 St Andrews Square · From 45p/kWh
- [ubitricity Distributed Energy Systems UK Ltd. 39 St Andrew Square, Outside 39](https://ampmap.co.uk/charger/ubitricity-39-st-andrew-square-outside-39-uk) - Ubitricity · Type 2 5 kW · 39 St Andrew Square, Outside 39 · From 45p/kWh
- [ubitricity Distributed Energy Systems UK Ltd. 67 Westfield Road, Outside No 67](https://ampmap.co.uk/charger/ubitricity-67-westfield-road-outside-no-67-uk) - Ubitricity · Type 2 5 kW · 67 Westfield Road, Outside No 67 · From 45p/kWh
- [Westfield Road · SureCharge](https://ampmap.co.uk/charger/surecharge-westfield-road-uk) - Type 2 4 kW · Westfield Road
- [St Marys Road · SureCharge](https://ampmap.co.uk/charger/surecharge-st-marys-road-uk) - Type 2 5 kW · St Marys Road
- [ubitricity Distributed Energy Systems UK Ltd. 15 St Marys Road, Adjacent 15](https://ampmap.co.uk/charger/ubitricity-15-st-marys-road-adjacent-15-uk) - Ubitricity · Type 2 5 kW · 15 St Marys Road, Adjacent 15 · From 45p/kWh

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/surecharge-st-andrews-square-2-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 8 Mar 2023).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
