SureCharge · EV charging site
Tabor Road
Tabor Road, Shepherds Bush, W6 0BW
Tabor Road is an EV charging site in Shepherds Bush, Greater London (W6 0BW), run by SureCharge. It has a single 5 kW Type 2 socket. Amp Map lists 3 other charge points named Tabor Road in Shepherds Bush. 1,605 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Sussex Place (ESB Energy), 0.5 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- SureCharge
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Phone (from Open Charge Map)
- +44 1732 600 700
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Tabor Road (SureCharge)?
Up to 5 kW AC via Type 2.
How many charging sockets does Tabor Road (SureCharge) have?
1 charging socket: 1 × 5 kW Type 2.
Who operates Tabor Road?
Tabor Road is on the SureCharge network. For site issues, the operator lists +44 1732 600 700.
Where is the nearest charger with 50 kW or more to Tabor Road (SureCharge)?
Sussex Place (ESB Energy) is 0.5 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Tabor Road (SureCharge)?
A 10–80% charge takes about 11h 4m on the 5 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Tabor Road (SureCharge)?
A 10–80% charge takes about 7h 59m on the 5 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Tabor Road (SureCharge)?
A 10–80% charge takes about 10h 13m on the 5 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- ubitricity Distributed Energy Systems UK Ltd. 30 Tabor Road, Needs Fuse Carrier O S No 30
- ubitricity Distributed Energy Systems UK Ltd. 17-19 Tabor Road, O S 17 19
- ubitricity Distributed Energy Systems UK Ltd. 43 Iffley Road, O S No 43
- ubitricity Distributed Energy Systems UK Ltd. 31-33 Iffley Road, O S Nos 31 33
- Iffley Road
- ubitricity Distributed Energy Systems UK Ltd. 6 Tabor Road, O S No 6
- Cheapest nearby
- ubitricity Distributed Energy Systems UK Ltd. 30 Tabor Road, Needs Fuse Carrier O S No 30 · 56p per kWh · 5 kW · 10 yd