SureCharge · EV charging site
Vereker Road
Vereker Road, Fulham, W14 9JR
Vereker Road is an EV charging site in Fulham, Greater London (W14 9JR), run by SureCharge. It has a single 5 kW Type 2 socket. Amp Map lists 1 other charge point named Vereker Road in Fulham. 1,559 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Lille Road (Normand Park layby) (ESB Energy), 0.2 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- SureCharge
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Phone (from Open Charge Map)
- +44 1732 600 700
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Vereker Road (SureCharge)?
Up to 5 kW AC via Type 2.
How many charging sockets does Vereker Road (SureCharge) have?
1 charging socket: 1 × 5 kW Type 2.
Who operates Vereker Road?
Vereker Road is on the SureCharge network. For site issues, the operator lists +44 1732 600 700.
Where is the nearest charger with 50 kW or more to Vereker Road (SureCharge)?
Lille Road (Normand Park layby) (ESB Energy) is 0.2 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Vereker Road (SureCharge)?
A 10–80% charge takes about 11h 4m on the 5 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Vereker Road (SureCharge)?
A 10–80% charge takes about 7h 59m on the 5 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Vereker Road (SureCharge)?
A 10–80% charge takes about 10h 13m on the 5 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- ubitricity Distributed Energy Systems UK Ltd. 7 Vereker Road, Opposite 7
- ubitricity Distributed Energy Systems UK Ltd. 72 Star Road, Outside 72
- ubitricity Distributed Energy Systems UK Ltd. 41 Vereker Road, Side Of 41 Perham Road
- ubitricity Distributed Energy Systems UK Ltd. 1 Normand Road, opp.
- ubitricity Distributed Energy Systems UK Ltd. 66 Star Road, Opposite 66
- Star Road
- Cheapest nearby
- ubitricity Distributed Energy Systems UK Ltd. 7 Vereker Road, Opposite 7 · 67p per kWh · 5 kW · 30 yd