SureCharge · EV charging site
Wellersley Road
Wellersley Road, Chiswick, W4 4BU
Wellersley Road is an EV charging site in Chiswick, Greater London (W4 4BU), run by SureCharge. It has a single 4 kW Type 2 socket. Amp Map lists 2 other charge points named Wellersley Road in Chiswick. 214 other charging sites are listed within a mile, and the nearest site with 50 kW or more is 4 Power Road (BP Pulse), 0.2 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- SureCharge
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Phone (from Open Charge Map)
- +44 1732 600 700
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Wellersley Road (SureCharge)?
Up to 4 kW AC via Type 2.
How many charging sockets does Wellersley Road (SureCharge) have?
1 charging socket: 1 × 4 kW Type 2.
Who operates Wellersley Road?
Wellersley Road is on the SureCharge network. For site issues, the operator lists +44 1732 600 700.
Where is the nearest charger with 50 kW or more to Wellersley Road (SureCharge)?
4 Power Road (BP Pulse) is 0.2 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Wellersley Road (SureCharge)?
A 10–80% charge takes about 13h 50m on the 4 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Wellersley Road (SureCharge)?
A 10–80% charge takes about 9h 59m on the 4 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Wellersley Road (SureCharge)?
A 10–80% charge takes about 12h 46m on the 4 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- ubitricity Distributed Energy Systems UK Ltd. 31 Wellersley Road, Outside No 31
- ubitricity Distributed Energy Systems UK Ltd. 26A Wellersley Road, Outside No 26A
- Grange Road
- ubitricity Distributed Energy Systems UK Ltd. 2 Grange Road, Outside No 2
- ubitricity Distributed Energy Systems UK Ltd. 20 Wellersley Road, Outside No 20
- ubitricity Distributed Energy Systems UK Ltd. 42 Wellersley Road, Opp No 42
- Cheapest nearby
- ubitricity Distributed Energy Systems UK Ltd. 31 Wellersley Road, Outside No 31 · 67p per kWh · 5 kW · 10 yd
- Fastest nearby
- ubitricity Distributed Energy Systems UK Ltd. 31 Wellersley Road, Outside No 31 · 5 kW · 10 yd