SureCharge · EV charging site
Wellersley Road
Wellersley Road, Chiswick, W4 3AT
Wellersley Road is an EV charging site in Chiswick, Greater London (W4 3AT), run by SureCharge. It has a single 4 kW Type 2 socket. Amp Map lists 2 other charge points named Wellersley Road in Chiswick. 161 other charging sites are listed within a mile, and the nearest site with 50 kW or more is 4 Power Road (BP Pulse), 0.2 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- SureCharge
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Phone (from Open Charge Map)
- +44 1732 600 700
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Wellersley Road (SureCharge)?
Up to 4 kW AC via Type 2.
How many charging sockets does Wellersley Road (SureCharge) have?
1 charging socket: 1 × 4 kW Type 2.
Who operates Wellersley Road?
Wellersley Road is on the SureCharge network. For site issues, the operator lists +44 1732 600 700.
Where is the nearest charger with 50 kW or more to Wellersley Road (SureCharge)?
4 Power Road (BP Pulse) is 0.2 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Wellersley Road (SureCharge)?
A 10–80% charge takes about 13h 50m on the 4 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Wellersley Road (SureCharge)?
A 10–80% charge takes about 9h 59m on the 4 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Wellersley Road (SureCharge)?
A 10–80% charge takes about 12h 46m on the 4 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- ubitricity Distributed Energy Systems UK Ltd. 63 Wellersley Road, Outside No 63
- ubitricity Distributed Energy Systems UK Ltd. 73 Stile Hall Gardens, Outside No 73
- ubitricity Distributed Energy Systems UK Ltd. 58 Stile Hall Gardens, Outside No 58
- Stile Hall Gardens
- Brentford Fountain Leisure Centre
- Brentford Fountain Leisure Centre
- Cheapest nearby
- ubitricity Distributed Energy Systems UK Ltd. 63 Wellersley Road, Outside No 63 · 56p per kWh · 5 kW · 10 yd
- Fastest nearby
- Brentford Fountain Leisure Centre · 7 kW · 0.1 mi