EV charging site
Tap Zap Go - Medway City Estate
Whitewall Centre, Whitewall Road, Rochester, ME2 4DZ
Tap Zap Go - Medway City Estate is an EV charging site in Rochester, Medway. All 4 of its sockets are 120 kW CCS, and the price is listed as 0.49p / kWh. 6 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is McDonald's Terance Butler Avenue (InstaVolt Ltd), 0.2 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- 0.49p / kWh(from Open Charge Map, 20 Dec 2025)
- Phone (from Open Charge Map)
- 0208 804 2000
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Tap Zap Go - Medway City Estate?
The listed price is 0.49p / kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at Tap Zap Go - Medway City Estate?
Up to 120 kW DC via CCS.
How many charging sockets does Tap Zap Go - Medway City Estate have?
4 charging sockets: 3 × 120 kW CCS.
Where is the nearest other charger with 50 kW or more to Tap Zap Go - Medway City Estate?
McDonald's Terance Butler Avenue (InstaVolt Ltd) is 0.2 miles away in a straight line, with up to 63 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Tap Zap Go - Medway City Estate?
A typical 10–80% rapid charge takes about 31 min on the 120 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Tap Zap Go - Medway City Estate?
A typical 10–80% rapid charge takes about 26 min on the 120 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Tap Zap Go - Medway City Estate?
A typical 10–80% rapid charge takes about 40 min on the 120 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- McDonald's Terance Butler Avenue
- Energy Solutions
- Cory's Road 1
- Commercial Road 1
- Morrisons Strood
- Pod Point Tesco Superstore - Strood
- Cheapest nearby
- Pod Point Tesco Superstore - Strood · 44.4p per kWh · 7 kW · 0.9 mi