Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

Tesla · EV charging site

Gretna Green, UK

A74M Junction 21/22, Carlisle, DG16 5HQ

Gretna Green, UK is an EV charging site in Carlisle, Cumbria, run by Tesla and open 24 hours a day. All 14 of its sockets are 250 kW CCS, and published prices run from £0.61 to £0.74 per kWh. Recorded live status shows it is usually busiest around noon, and Amp Map measured 100% uptime and recorded 2890 charging sessions here over the last 30 days. 3 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is EH - Welcome Break Gretna Green (GRIDSERVE), 30 yards away.

Status

14 of 14 available

Checking status…

VerifiedLive status and details from Tesla’s data feed. Amp Map updates them automatically.Last synced 21 Nov 2026

Connectors

CCS · 250 kW14 connectors · 61p per kWh14 free
1A100% reliabilityAvailable
1B100% reliabilityAvailable
1C100% reliabilityAvailable
1D100% reliabilityAvailable
2A100% reliabilityAvailable
2B99% reliabilityAvailable
2C99% reliabilityAvailable
2D100% reliabilityAvailable

Reliability is the share of time each socket was not out of order, over the last 30 days.

Site information

Operator
Tesla
Opening hours
Open 24 hours
Payment
Contactless card at the chargerIn the Tesla app
Charger ID
1A
Owner
Tesla, Inc.

Always check directly with the charge point operator for the most up-to-date information.

Prices

Price times

RateHoursPriceCurrent
Off-peak00:00–16:00£0.61/kWh
Peak16:00–20:00£0.74/kWh
Off-peak20:00–00:00£0.61/kWh

Price at the charger, including VAT. Paying in the operator's app may cost less.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 250 kW CCS~22 min · ≈ 55 kWh · ~£34
Tesla Model 3 Rear-Wheel Drive 10–80% · 250 kW CCS~23 min · ≈ 40 kWh · ~£24
Audi Q4 e-tron 50 10–80% · 250 kW CCS~39 min · ≈ 51 kWh · ~£31
Hyundai IONIQ 5 10–80% · 250 kW CCS~18 min · ≈ 51 kWh · ~£31
MG Motor MG4 Trophy 10–80% · 250 kW CCS~30 min · ≈ 43 kWh · ~£26
Hyundai Kona Electric Long Range 10–80% · 250 kW CCS~39 min · ≈ 41 kWh · ~£25

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How much does it cost to charge at Gretna Green, UK (Tesla)?

The listed price is £0.61–£0.74/kWh · varies by time of day. Prices can change, so check the price at the charger before you start.

How fast is charging at Gretna Green, UK (Tesla)?

Up to 250 kW DC via CCS.

How many charging sockets does Gretna Green, UK (Tesla) have?

14 charging sockets: 14 × 250 kW CCS. Live per-socket availability is shown on this page.

Is Gretna Green, UK (Tesla) open 24/7?

Yes - Gretna Green, UK (Tesla) is open 24 hours a day, 7 days a week.

When is Gretna Green, UK (Tesla) busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around noon and quietest around 11 pm. The live status on this page shows what is free before you set off.

How reliable is Gretna Green, UK (Tesla)?

Amp Map measured 100% uptime here from recorded live status over the last 30 days, across 2890 observed charging sessions.

Who operates Gretna Green, UK?

Gretna Green, UK is on the Tesla network.

Where is the nearest other charger with 50 kW or more to Gretna Green, UK (Tesla)?

EH - Welcome Break Gretna Green (GRIDSERVE) is 30 yards away in a straight line, with up to 50 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at Gretna Green, UK (Tesla)?

A typical 10–80% rapid charge takes about 22 min on the 250 kW CCS here, adding roughly 55 kWh (~£34 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Gretna Green, UK (Tesla)?

A typical 10–80% rapid charge takes about 23 min on the 250 kW CCS here, adding roughly 40 kWh (~£24 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Gretna Green, UK (Tesla)?

A typical 10–80% rapid charge takes about 39 min on the 250 kW CCS here, adding roughly 51 kWh (~£31 at the published price). Estimates assume a typical charge curve and a warm battery.

Data: Tesla · synced 21 Nov 2026

Amp Map does not take payment. You pay the operator.