Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

Tesla · EV charging site

Northampton, UK - Grange Park

Junction 15, M1, Loake Close, Grange Park, Northampton, NN4 5EZ

Northampton, UK - Grange Park is an EV charging site in Northampton, West Northamptonshire, run by Tesla and open 24 hours a day. Its 6 sockets reach up to 150 kW, with Type 2 and CCS at the top speed, and published prices run from £0.34 to £0.63 per kWh. Recorded live status shows it is usually busiest around 10 pm, and Amp Map measured 98% uptime and recorded 2746 charging sessions here over the last 30 days. 4 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Harvester Grange Park (BP Pulse), 70 yards away.

Status

4 of 6 available

Checking status…

VerifiedLive status and details from Tesla’s data feed. Amp Map updates them automatically.Last synced 22 Nov 2026

Connectors

CCS or Type 2 · 150 kW2 connectors · 63p per kWh1 free1 in use
1A100% reliabilityCharging
1B100% reliabilityAvailable
CCS or Type 2 · 130 kW4 connectors · 63p per kWh3 free1 in use
2A100% reliabilityAvailable
2B100% reliabilityCharging
3A95% reliabilityAvailable
3B91% reliabilityAvailable

Reliability is the share of time each socket was not out of order, over the last 30 days.

Site information

Operator
Tesla
Opening hours
Open 24 hours
Payment
Contactless card at the chargerIn the Tesla app
Charger ID
1A
Owner
Tesla, Inc.

Always check directly with the charge point operator for the most up-to-date information.

Prices

Price times

RateHoursPriceCurrent
Off-peak00:00–08:00£0.34/kWh
Peak08:00–22:00£0.63/kWh
Off-peak22:00–00:00£0.34/kWh

Price at the charger, including VAT. Paying in the operator's app may cost less.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 150 kW Type 2~27 min · ≈ 55 kWh · ~£35
Tesla Model 3 Rear-Wheel Drive 10–80% · 150 kW Type 2~24 min · ≈ 40 kWh · ~£25
Audi Q4 e-tron 50 10–80% · 150 kW Type 2~39 min · ≈ 51 kWh · ~£32
Hyundai IONIQ 5 10–80% · 150 kW Type 2~23 min · ≈ 51 kWh · ~£32
MG Motor MG4 Trophy 10–80% · 150 kW Type 2~30 min · ≈ 43 kWh · ~£27
Hyundai Kona Electric Long Range 10–80% · 150 kW Type 2~39 min · ≈ 41 kWh · ~£26
Nissan LEAF 10–80% · 150 kW Type 2~54 min · ≈ 28 kWh · ~£18

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How much does it cost to charge at Northampton, UK - Grange Park (Tesla)?

The listed price is £0.34–£0.63/kWh · varies by time of day. Prices can change, so check the price at the charger before you start.

How fast is charging at Northampton, UK - Grange Park (Tesla)?

Up to 150 kW DC via Type 2, CCS.

How many charging sockets does Northampton, UK - Grange Park (Tesla) have?

6 charging sockets: 2 × 150 kW Type 2, 2 × 150 kW CCS, 4 × 130 kW CCS, 4 × 130 kW Type 2. Live per-socket availability is shown on this page.

Is Northampton, UK - Grange Park (Tesla) open 24/7?

Yes - Northampton, UK - Grange Park (Tesla) is open 24 hours a day, 7 days a week.

When is Northampton, UK - Grange Park (Tesla) busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 10 pm and quietest around 9 pm. The live status on this page shows what is free before you set off.

How reliable is Northampton, UK - Grange Park (Tesla)?

Amp Map measured 98% uptime here from recorded live status over the last 30 days, across 2746 observed charging sessions.

Who operates Northampton, UK - Grange Park?

Northampton, UK - Grange Park is on the Tesla network.

Where is the nearest other charger with 50 kW or more to Northampton, UK - Grange Park (Tesla)?

Harvester Grange Park (BP Pulse) is 70 yards away in a straight line, with up to 50 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at Northampton, UK - Grange Park (Tesla)?

A typical 10–80% rapid charge takes about 27 min on the 150 kW Type 2 here, adding roughly 55 kWh (~£35 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Northampton, UK - Grange Park (Tesla)?

A typical 10–80% rapid charge takes about 24 min on the 150 kW Type 2 here, adding roughly 40 kWh (~£25 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Northampton, UK - Grange Park (Tesla)?

A typical 10–80% rapid charge takes about 39 min on the 150 kW Type 2 here, adding roughly 51 kWh (~£32 at the published price). Estimates assume a typical charge curve and a warm battery.

Data: Tesla · synced 22 Nov 2026

Amp Map does not take payment. You pay the operator.