Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

Tesla · EV charging site

Nottingham, UK - Loughborough Road

5-27, Loughborough Road, West Bridgford, NG2 7LJ

Nottingham, UK - Loughborough Road is an EV charging site in West Bridgford, Nottinghamshire, run by Tesla and open 24 hours a day. All 8 of its sockets are 250 kW CCS, and published prices run from £0.35 to £0.63 per kWh. Recorded live status shows it is usually busiest around 7 am, and Amp Map measured 98% uptime and recorded 3105 charging sessions here over the last 30 days. 16 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Nottinghamshire County Council (BP Pulse), 60 yards away.

Status

6 of 8 available

Checking status…

VerifiedLive status and details from Tesla’s data feed. Amp Map updates them automatically.Last synced 22 Nov 2026

Connectors

CCS · 250 kW8 connectors · 35p per kWh6 free2 in use
1A100% reliabilityAvailable
1B100% reliabilityAvailable
1C100% reliabilityAvailable
1D100% reliabilityCharging
2A96% reliabilityAvailable
2B96% reliabilityAvailable
2C96% reliabilityCharging
2D96% reliabilityAvailable

Reliability is the share of time each socket was not out of order, over the last 30 days.

Site information

Operator
Tesla
Opening hours
Open 24 hours
Payment
Contactless card at the chargerIn the Tesla app
Charger ID
1A
Owner
Tesla, Inc.

Always check directly with the charge point operator for the most up-to-date information.

Prices

Price times

RateHoursPriceCurrent
Off-peak00:00–08:00£0.35/kWh
Peak08:00–20:00£0.63/kWh
Standard20:00–00:00£0.44/kWh

Price at the charger, including VAT. Paying in the operator's app may cost less.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 250 kW CCS~22 min · ≈ 55 kWh · ~£19
Tesla Model 3 Rear-Wheel Drive 10–80% · 250 kW CCS~23 min · ≈ 40 kWh · ~£14
Audi Q4 e-tron 50 10–80% · 250 kW CCS~39 min · ≈ 51 kWh · ~£18
Hyundai IONIQ 5 10–80% · 250 kW CCS~18 min · ≈ 51 kWh · ~£18
MG Motor MG4 Trophy 10–80% · 250 kW CCS~30 min · ≈ 43 kWh · ~£15
Hyundai Kona Electric Long Range 10–80% · 250 kW CCS~39 min · ≈ 41 kWh · ~£14

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How much does it cost to charge at Nottingham, UK - Loughborough Road (Tesla)?

The listed price is £0.35–£0.63/kWh · varies by time of day. Prices can change, so check the price at the charger before you start.

How fast is charging at Nottingham, UK - Loughborough Road (Tesla)?

Up to 250 kW DC via CCS.

How many charging sockets does Nottingham, UK - Loughborough Road (Tesla) have?

8 charging sockets: 8 × 250 kW CCS. Live per-socket availability is shown on this page.

Is Nottingham, UK - Loughborough Road (Tesla) open 24/7?

Yes - Nottingham, UK - Loughborough Road (Tesla) is open 24 hours a day, 7 days a week.

When is Nottingham, UK - Loughborough Road (Tesla) busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 7 am and quietest around 11 pm. The live status on this page shows what is free before you set off.

How reliable is Nottingham, UK - Loughborough Road (Tesla)?

Amp Map measured 98% uptime here from recorded live status over the last 30 days, across 3105 observed charging sessions.

Who operates Nottingham, UK - Loughborough Road?

Nottingham, UK - Loughborough Road is on the Tesla network.

Where is the nearest other charger with 50 kW or more to Nottingham, UK - Loughborough Road (Tesla)?

Nottinghamshire County Council (BP Pulse) is 60 yards away in a straight line, with up to 50 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at Nottingham, UK - Loughborough Road (Tesla)?

A typical 10–80% rapid charge takes about 22 min on the 250 kW CCS here, adding roughly 55 kWh (~£19 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Nottingham, UK - Loughborough Road (Tesla)?

A typical 10–80% rapid charge takes about 23 min on the 250 kW CCS here, adding roughly 40 kWh (~£14 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Nottingham, UK - Loughborough Road (Tesla)?

A typical 10–80% rapid charge takes about 39 min on the 250 kW CCS here, adding roughly 51 kWh (~£18 at the published price). Estimates assume a typical charge curve and a warm battery.

Data: Tesla · synced 22 Nov 2026

Amp Map does not take payment. You pay the operator.