Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

Pod Point · EV charging site

Pod Point Oakley Hall Hotel

Rectory Road Oakley, Basingstoke, RG23 7EL

Pod Point Oakley Hall Hotel is an EV charging site in Basingstoke, Hampshire, run by Pod Point. Its 8 sockets reach up to 22 kW, with Type 2 at the top speed, and published prices run from £0.40 to £0.49 per kWh. Recorded live status shows it is usually busiest around 7 am, and Amp Map measured 74% uptime and recorded 93 charging sessions here over the last 30 days. 1 other charging site is listed within a mile, and the nearest site with 50 kW or more is The Stag and Hounds Harvester (BP Pulse), 3.7 miles away.

Status

5 of 8 available

Checking status…

VerifiedLive status and details from Pod Point’s data feed. Amp Map updates them automatically.Last synced 21 Nov 2026

Connectors

Type 2 · 22 kW2 connectors · 49.2p per kWh1 free1 out of service
Jean-Gail0% reliabilityOut of order
Jean-Gail0% reliabilityAvailable
Type 2 · 7 kW6 connectors · 39.6p per kWh4 free1 in use1 out of service
Amir-Zack100% reliabilityAvailable
Amir-Zack100% reliabilityAvailable
Andy-Emil0% reliabilityAvailable
Andy-Emil0% reliabilityOut of order
Beck-Emma100% reliabilityCharging
Beck-Emma100% reliabilityAvailable

Reliability is the share of time each socket was not out of order, over the last 30 days.

Site information

Operator
Pod Point
Opening hours
Not published
Payment
In the Pod Point app
Charger ID
Amir-Zack

Facilities

Hotel / inn

Always check directly with the charge point operator for the most up-to-date information.

Prices

ConnectorPowerPrice
Type 222 kW49.2p per kWh
Type 27 kW39.6p per kWh

Price at the charger, including VAT. Paying in the operator's app may cost less.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 22 kW Type 2~5h 2m · ≈ 55 kWh · ~£27
Tesla Model 3 Rear-Wheel Drive 10–80% · 22 kW Type 2~3h 38m · ≈ 40 kWh · ~£20
Audi Q4 e-tron 50 10–80% · 22 kW Type 2~4h 39m · ≈ 51 kWh · ~£25
Hyundai IONIQ 5 10–80% · 22 kW Type 2~4h 37m · ≈ 51 kWh · ~£25
MG Motor MG4 Trophy 10–80% · 22 kW Type 2~3h 53m · ≈ 43 kWh · ~£21
Hyundai Kona Electric Long Range 10–80% · 22 kW Type 2~5h 38m · ≈ 41 kWh · ~£20
Nissan LEAF 10–80% · 22 kW Type 2~4h 15m · ≈ 28 kWh · ~£14

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How much does it cost to charge at Pod Point Oakley Hall Hotel?

The listed price is Type 2 £0.40/kWh · Type 2 £0.49/kWh. Prices can change, so check the price at the charger before you start.

How fast is charging at Pod Point Oakley Hall Hotel?

Up to 22 kW AC via Type 2.

How many charging sockets does Pod Point Oakley Hall Hotel have?

8 charging sockets: 6 × 7 kW Type 2, 2 × 22 kW Type 2. Live per-socket availability is shown on this page.

When is Pod Point Oakley Hall Hotel busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 7 am and quietest around 5 pm. The live status on this page shows what is free before you set off.

How reliable is Pod Point Oakley Hall Hotel?

Amp Map measured 74% uptime here from recorded live status over the last 30 days, across 93 observed charging sessions.

Who operates Pod Point Oakley Hall Hotel?

Pod Point Oakley Hall Hotel is on the Pod Point network.

Where is the nearest charger with 50 kW or more to Pod Point Oakley Hall Hotel?

The Stag and Hounds Harvester (BP Pulse) is 3.7 miles away in a straight line, with up to 50 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at Pod Point Oakley Hall Hotel?

A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh (~£27 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Pod Point Oakley Hall Hotel?

A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh (~£20 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Pod Point Oakley Hall Hotel?

A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh (~£25 at the published price). Estimates assume a typical charge curve and a warm battery.

Data: Pod Point · synced 21 Nov 2026

Amp Map does not take payment. You pay the operator.