Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

EV charging site

The Cake College

Bartlett’s Farmhouse, Lower Earley, RG29JX

The Cake College is an EV charging site in Lower Earley, Wokingham. Both of its sockets are 7 kW Type 2 and NACS, and charging is listed as free. 5 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Wokingham, UK (Tesla), 2.8 miles away.

Status

No live status

We don't have live status for this charger. Check it when you arrive.

Community dataThird-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.Last verified 5 Jul 2018Last verified 5 Jul 2018

Connectors

Type 2 · 7 kW1 connector
NACS · 7 kW1 connector

Site information

Opening hours
Not published
Access
Customers only
Price
Free(from Open Charge Map, 5 Jul 2018)
Phone (from Open Charge Map)
011820911720917

Always check directly with the charge point operator for the most up-to-date information.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 7 kW Type 2~7h 54m
Tesla Model 3 Rear-Wheel Drive 10–80% · 7 kW Type 2~5h 42m
Audi Q4 e-tron 50 10–80% · 7 kW Type 2~7h 18m
Hyundai IONIQ 5 10–80% · 7 kW Type 2~7h 16m
MG Motor MG4 Trophy 10–80% · 7 kW Type 2~6h 6m
Hyundai Kona Electric Long Range 10–80% · 7 kW Type 2~5h 48m
Nissan LEAF 10–80% · 7 kW Type 2~4h 15m

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How much does it cost to charge at The Cake College?

The listed price is Free. Prices can change, so check the price at the charger before you start.

How fast is charging at The Cake College?

Up to 7 kW AC via Type 2, NACS.

How many charging sockets does The Cake College have?

2 charging sockets: 1 × 7 kW Type 2, 1 × 7 kW NACS.

Can anyone charge at The Cake College?

The operator lists this charger for customers of the site.

Where is the nearest charger with 50 kW or more to The Cake College?

Wokingham, UK (Tesla) is 2.8 miles away in a straight line, with up to 150 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at The Cake College?

A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at The Cake College?

A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at The Cake College?

A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

Data: Open Charge Map · verified 5 Jul 2018

Amp Map does not take payment. You pay the operator.