GeniePoint · EV charging site
BP Upper Beeding
High Street, Shoreham-by-Sea, BN44 3TQ
BP Upper Beeding is an EV charging site in Shoreham-by-Sea, West Sussex, run by GeniePoint. It has a single socket, with CHAdeMO and CCS at up to 50 kW, and the price is listed as £1.00 + £0.30/kWh. 1 other charging site is listed within a mile, and the nearest other site with 50 kW or more is M&S Shoreham (BP Pulse), 3.4 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- GeniePoint
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- £1.00 + £0.30/kWh(from Open Charge Map, 5 Nov 2018)
- Phone (from Open Charge Map)
- +44 800 999 4240
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at BP Upper Beeding (GeniePoint)?
The listed price is £1.00 + £0.30/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at BP Upper Beeding (GeniePoint)?
Up to 50 kW DC via Type 2, CHAdeMO, CCS.
How many charging sockets does BP Upper Beeding (GeniePoint) have?
1 charging socket: 1 × 43 kW Type 2, 1 × 50 kW CHAdeMO, 1 × 50 kW CCS.
Who operates BP Upper Beeding?
BP Upper Beeding is on the GeniePoint network. For site issues, the operator lists +44 800 999 4240.
Where is the nearest other charger with 50 kW or more to BP Upper Beeding (GeniePoint)?
M&S Shoreham (BP Pulse) is 3.4 miles away in a straight line, with up to 300 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at BP Upper Beeding (GeniePoint)?
A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at BP Upper Beeding (GeniePoint)?
A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at BP Upper Beeding (GeniePoint)?
A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- The Best Western Old Tollgate Hotel & Restaurant
- Lancing Manor Leisure Centre
- M&S Shoreham
- Pod Point Tesco Extra - Shoreham-by-sea
- Pod Point Brighton & Hove Albion Football Club Limited, BN15 9FP
- Pod Point The Shoreham Centre
- Cheapest nearby
- Pod Point Tesco Extra - Shoreham-by-sea · 44.4p per kWh · 7 kW · 3.4 mi
- Fastest nearby
- M&S Shoreham · 300 kW · 3.4 mi