# Car Park D Ford Dunton Technical Centre · GeniePoint

Web page: https://ampmap.co.uk/charger/the-geniepoint-network-car-park-d-ford-dunton-technical-centre-uk

Car Park D Ford Dunton Technical Centre is an EV charging site in Basildon, Essex, run by GeniePoint. All 6 of its sockets are 7 kW Type 2, and the price is listed as Â£0.50 + Â£0.14/kWh.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** Ford Dunton Technical Centre, SS15 6EE
- **Area:** Basildon, Essex, United Kingdom
- **Coordinates (latitude, longitude):** 51.58385, 0.40466

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| Type 2 | 7 kW | 6 | Not listed |

- **Price:** Â£0.50 + Â£0.14/kWh (from Open Charge Map)

## Site information

- **Operator:** GeniePoint
- **Opening hours:** Not published
- **Access:** Public · membership required · access key required

## Common questions

### How much does it cost to charge at Car Park D Ford Dunton Technical Centre (GeniePoint)?

The listed price is Â£0.50 + Â£0.14/kWh. Prices can change, so check the price at the charger before you start.

### How fast is charging at Car Park D Ford Dunton Technical Centre (GeniePoint)?

Up to 7 kW AC via Type 2.

### How many charging sockets does Car Park D Ford Dunton Technical Centre (GeniePoint) have?

6 charging sockets: 6 × 7 kW Type 2.

### Who operates Car Park D Ford Dunton Technical Centre?

Car Park D Ford Dunton Technical Centre is on the GeniePoint network. For site issues, the operator lists +44 800 999 4240.

### How long does a Tesla Model Y Long Range take to charge at Car Park D Ford Dunton Technical Centre (GeniePoint)?

A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Car Park D Ford Dunton Technical Centre (GeniePoint)?

A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Car Park D Ford Dunton Technical Centre (GeniePoint)?

A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Basildon](https://ampmap.co.uk/chargers/united-kingdom/essex/basildon)
- [GeniePoint chargers](https://ampmap.co.uk/networks/geniepoint)

## Chargers near this site

- [Ford Motor Company](https://ampmap.co.uk/charger/ford-motor-company-uk) - Dunton technical Centre
- [Ford Reception · GeniePoint](https://ampmap.co.uk/charger/the-geniepoint-network-ford-reception-uk) - Type 2 7 kW · Ford Dunton Technical Centre
- [Laindon · GeniePoint](https://ampmap.co.uk/charger/the-geniepoint-network-laindon-uk) - Type 2 7 kW · Laindon
- [West Mayne · Chargemaster](https://ampmap.co.uk/charger/chargemaster-west-mayne-uk) - Type 2 7 kW · West Mayne
- [Pod Point Tesco Superstore - Basildon Langdon Hills](https://ampmap.co.uk/charger/pod-point-tesco-superstore-basildon-langdon-hills-uk) - Type 2 7 kW · Mandeville Way · From 44.4p/kWh
- [Noak Bridge (Laindon) · evyve](https://ampmap.co.uk/charger/evyve-noak-bridge-laindon-uk) - CCS 75 kW, CHAdeMO 75 kW · Wash Road · From 85p/kWh

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/the-geniepoint-network-car-park-d-ford-dunton-technical-centre-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 11 Oct 2020).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
