# Central Carpark Keswick · GeniePoint

Web page: https://ampmap.co.uk/charger/the-geniepoint-network-central-carpark-keswick-uk

Central Carpark Keswick is an EV charging site in Keswick, Cumbria, run by GeniePoint. Its 5 sockets reach up to 50 kW, with CCS and CHAdeMO at the top speed.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** Central Car Park, CA12 5DF
- **Area:** Keswick, Cumbria, United Kingdom
- **Coordinates (latitude, longitude):** 54.60051, -3.13804
- **Getting there:** Shopping - 1 min walk

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| CCS | 50 kW | 1 | Not listed |
| CHAdeMO | 50 kW | 1 | Not listed |
| Type 2 | 43 kW | 1 | Not listed |
| Type 2 | 7 kW | 2 | Not listed |

## Site information

- **Operator:** GeniePoint
- **Opening hours:** Not published
- **Access:** Public
- **Payment:** Pay at the charger (from Open Charge Map)

## Common questions

### How fast is charging at Central Carpark Keswick (GeniePoint)?

Up to 50 kW DC via Type 2, CCS, CHAdeMO.

### How many charging sockets does Central Carpark Keswick (GeniePoint) have?

5 charging sockets: 1 × 43 kW Type 2, 1 × 50 kW CCS, 2 × 7 kW Type 2, 1 × 50 kW CHAdeMO.

### Who operates Central Carpark Keswick?

Central Carpark Keswick is on the GeniePoint network. For site issues, the operator lists +44 800 999 4240.

### How long does a Tesla Model Y Long Range take to charge at Central Carpark Keswick (GeniePoint)?

A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Central Carpark Keswick (GeniePoint)?

A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Central Carpark Keswick (GeniePoint)?

A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Keswick](https://ampmap.co.uk/chargers/united-kingdom/cumbria/keswick)
- [GeniePoint chargers](https://ampmap.co.uk/networks/geniepoint)

## Chargers near this site

- [Central Car Park, Keswick · GeniePoint](https://ampmap.co.uk/charger/the-geniepoint-network-central-car-park-keswick-uk) - CCS 50 kW, CHAdeMO 50 kW · Lake Road
- [Booths InstaVolt Keswick · InstaVolt Ltd](https://ampmap.co.uk/charger/instavolt-ltd-booths-instavolt-keswick-uk) - CCS 62 kW, CHAdeMO 60 kW · Booths
- [Keswick Convention Centre · Fuuse](https://ampmap.co.uk/charger/fuuse-keswick-convention-centre-uk) - Type 2 22 kW · Skiddaw Street Centre Car Park
- [Premier Inn Keswick · GeniePoint](https://ampmap.co.uk/charger/the-geniepoint-network-premier-inn-keswick-uk) - Type 2 7 kW · Premier Inn Keswick
- [Low Briary Holiday Village · Monta](https://ampmap.co.uk/charger/monta-low-briary-holiday-village-uk) - Type 2 7 kW · Keswick Bypass
- [Pod Point Underscar Time Ownership Site](https://ampmap.co.uk/charger/pod-point-underscar-time-ownership-site-uk) - Type 2 7 kW · Underskiddaw Applethwaite · Free to use

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/the-geniepoint-network-central-carpark-keswick-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 7 Apr 2026).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
