GeniePoint · EV charging site
Civic Centre Car Park
St James Way, Royston, SG8 7XB
Civic Centre Car Park is an EV charging site in Royston, Hertfordshire, run by GeniePoint. Both of its sockets are 7 kW Type 2, and the price is listed as £0.00 + £0.30/kWh. 2 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Pod Point Tesco Extra - Royston, 0.9 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- GeniePoint
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- £0.00 + £0.30/kWh(from Open Charge Map, 2 Nov 2018)
- Phone (from Open Charge Map)
- +44 800 999 4240
- Notes
- APT Charge point. Formerly on Source East. Should now be configured to accept any RFID card. Device owner: North Hertfordshire District Council
- Getting there
- Level 5
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Civic Centre Car Park (GeniePoint)?
The listed price is £0.00 + £0.30/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at Civic Centre Car Park (GeniePoint)?
Up to 7 kW AC via Type 2.
How many charging sockets does Civic Centre Car Park (GeniePoint) have?
2 charging sockets: 2 × 7 kW Type 2.
Who operates Civic Centre Car Park?
Civic Centre Car Park is on the GeniePoint network. For site issues, the operator lists +44 800 999 4240.
Where is the nearest charger with 50 kW or more to Civic Centre Car Park (GeniePoint)?
Pod Point Tesco Extra - Royston is 0.9 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Civic Centre Car Park (GeniePoint)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Civic Centre Car Park (GeniePoint)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Civic Centre Car Park (GeniePoint)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Cheapest nearby
- Pod Point Tesco Extra - Royston · 44.4p per kWh · 50 kW · 0.9 mi
- Fastest nearby
- McDonald's Royston · 120 kW · 1.4 mi