GeniePoint · EV charging site
Cornwall Council West Looe
Millpool, Saltash, PL13 2AF
Cornwall Council West Looe is an EV charging site in Saltash, Cornwall, run by GeniePoint. It has a single socket, with CCS and CHAdeMO at up to 50 kW. 1 other charging site is listed within a mile, and the nearest other site with 50 kW or more is Tourist Information Centre West Looe (POGO), 10 yards away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- GeniePoint
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- £1.00 + £0.30/kWh; £10.00 overstay after 65 mins(from Open Charge Map, 7 Oct 2020)
- Phone (from Open Charge Map)
- +44 800 999 4240
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Cornwall Council West Looe (GeniePoint)?
The listed price is £1.00 + £0.30/kWh; £10.00 overstay after 65 mins. Prices can change, so check the price at the charger before you start.
How fast is charging at Cornwall Council West Looe (GeniePoint)?
Up to 50 kW DC via CCS, Type 2, CHAdeMO.
How many charging sockets does Cornwall Council West Looe (GeniePoint) have?
1 charging socket: 1 × 50 kW CCS, 1 × 43 kW Type 2, 1 × 50 kW CHAdeMO.
Who operates Cornwall Council West Looe?
Cornwall Council West Looe is on the GeniePoint network. For site issues, the operator lists +44 800 999 4240.
Where is the nearest other charger with 50 kW or more to Cornwall Council West Looe (GeniePoint)?
Tourist Information Centre West Looe (POGO) is 10 yards away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Cornwall Council West Looe (GeniePoint)?
A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Cornwall Council West Looe (GeniePoint)?
A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Cornwall Council West Looe (GeniePoint)?
A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Tourist Information Centre West Looe
- Millpool
- Treworgey Cottages
- Pod Point Laundry
- Pod Point Tennis Court
- zest-type-post-user
- Cheapest nearby
- Tourist Information Centre West Looe · 56p per kWh · 50 kW · 10 yd