# County Arms · GeniePoint

Web page: https://ampmap.co.uk/charger/the-geniepoint-network-county-arms-uk

County Arms is an EV charging site in Truro, Cornwall, run by GeniePoint. It has a single socket, with CHAdeMO and CCS at up to 50 kW.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** Highertown, TR1 3PY
- **Area:** Truro, Cornwall, United Kingdom
- **Coordinates (latitude, longitude):** 50.26147, -5.07289

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| CCS | 50 kW | 1 | Not listed |
| CHAdeMO | 50 kW | 1 | Not listed |
| Type 2 | 43 kW | 1 | Not listed |

- **Price:** £0.57 / kWh; £10.00 overstay every 90 mins (from Open Charge Map)

## Site information

- **Operator:** GeniePoint
- **Opening hours:** Not published
- **Access:** Public · membership required · access key required

## Common questions

### How much does it cost to charge at County Arms (GeniePoint)?

The listed price is £0.57 / kWh; £10.00 overstay every 90 mins. Prices can change, so check the price at the charger before you start.

### How fast is charging at County Arms (GeniePoint)?

Up to 50 kW DC via CHAdeMO, Type 2, CCS.

### How many charging sockets does County Arms (GeniePoint) have?

1 charging socket: 1 × 50 kW CHAdeMO, 1 × 43 kW Type 2, 1 × 50 kW CCS.

### Who operates County Arms?

County Arms is on the GeniePoint network. For site issues, the operator lists +44 800 999 4240.

### How long does a Tesla Model Y Long Range take to charge at County Arms (GeniePoint)?

A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at County Arms (GeniePoint)?

A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at County Arms (GeniePoint)?

A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Truro](https://ampmap.co.uk/chargers/united-kingdom/cornwall/truro)
- [GeniePoint chargers](https://ampmap.co.uk/networks/geniepoint)

## Chargers near this site

- [County Arms Highertown Truro · GeniePoint](https://ampmap.co.uk/charger/the-geniepoint-network-county-arms-highertown-truro-uk) - CHAdeMO 50 kW, Type 2 50 kW · Highertown
- [New County Hall - Truro - Cornwall · GeniePoint](https://ampmap.co.uk/charger/the-geniepoint-network-new-county-hall-truro-cornwall-uk) - Type 2 22 kW · A390
- [Pydar House · GeniePoint](https://ampmap.co.uk/charger/the-geniepoint-network-pydar-house-uk) - Type 2 22 kW, Type 2 7 kW · Pydar Street
- [Treliske Retail Park](https://ampmap.co.uk/charger/treliske-retail-park-uk) - Type 2 7 kW · Oak Lane
- [Pod Point Tesco Superstore - Truro](https://ampmap.co.uk/charger/pod-point-tesco-superstore-truro-uk) - Type 2 7 kW · Garras Wharf · From 44.4p/kWh
- [Truro East Park & Ride · GeniePoint](https://ampmap.co.uk/charger/the-geniepoint-network-truro-east-park-and-ride-uk) - Type 2 7 kW · Newquay Road

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/the-geniepoint-network-county-arms-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 29 Jul 2022).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
