# Cumbria County Council · GeniePoint

Web page: https://ampmap.co.uk/charger/the-geniepoint-network-cumbria-county-council-uk

Cumbria County Council is an EV charging site in Kendal, Cumbria, run by GeniePoint. Its 3 sockets reach up to 50 kW, with CHAdeMO and CCS at the top speed.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** Busher Walk, LA9 4RQ
- **Area:** Kendal, Cumbria, United Kingdom
- **Coordinates (latitude, longitude):** 54.33223, -2.74629
- **Getting there:** £10.00 overstay fee after 95 mins ,then £10.00 every subsequent 95 mins

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| CCS | 50 kW | 1 | Not listed |
| CHAdeMO | 50 kW | 1 | Not listed |
| Type 2 | 43 kW | 1 | Not listed |
| Type 2 | 7 kW | 2 | Not listed |

- **Price:** Â£0.30/kWh, + Â£0.30/kWh; Â£10.00 overstay after 65 mins (from Open Charge Map)

## Site information

- **Operator:** GeniePoint
- **Opening hours:** Not published
- **Access:** Public · membership required · access key required

## Common questions

### How much does it cost to charge at Cumbria County Council (GeniePoint)?

The listed price is Â£0.30/kWh, + Â£0.30/kWh; Â£10.00 overstay after 65 mins. Prices can change, so check the price at the charger before you start.

### How fast is charging at Cumbria County Council (GeniePoint)?

Up to 50 kW DC via CHAdeMO, Type 2, CCS.

### How many charging sockets does Cumbria County Council (GeniePoint) have?

3 charging sockets: 1 × 50 kW CHAdeMO, 1 × 43 kW Type 2, 1 × 50 kW CCS, 2 × 7 kW Type 2.

### Who operates Cumbria County Council?

Cumbria County Council is on the GeniePoint network. For site issues, the operator lists +44 800 999 4240.

### How long does a Tesla Model Y Long Range take to charge at Cumbria County Council (GeniePoint)?

A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Cumbria County Council (GeniePoint)?

A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Cumbria County Council (GeniePoint)?

A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Kendal](https://ampmap.co.uk/chargers/united-kingdom/cumbria/kendal)
- [GeniePoint chargers](https://ampmap.co.uk/networks/geniepoint)

## Chargers near this site

- [County Hall Kendal · GeniePoint](https://ampmap.co.uk/charger/the-geniepoint-network-county-hall-kendal-uk) - Type 2 7 kW · County Offices County Hall
- [Pod Point Westmorland & Furness Council - Kendal County Hall Car Park](https://ampmap.co.uk/charger/pod-point-cumbria-county-council-kendal-county-hall-car-park-uk) - Type 2 7 kW · Kendal County Hall Car Park, Busher Walk · From 50.4p/kWh
- [Booths Kendal Instavolt · InstaVolt Ltd](https://ampmap.co.uk/charger/instavolt-ltd-booths-kendal-instavolt-uk) - CCS 50 kW, CHAdeMO 50 kW · Booths
- [Peppercorn Lane Car Park · Fuuse](https://ampmap.co.uk/charger/fuuse-peppercorn-lane-car-park-uk) - Type 2 22 kW · 14 Peppercorn Ln
- [Kendal College · EO Charging](https://ampmap.co.uk/charger/eo-charging-kendal-college-uk) - Type 2 22 kW · Upper car park Vicarage Drive
- [Castle Green Hotel](https://ampmap.co.uk/charger/castle-green-hotel-uk) - Type 2 7 kW · Castle Green Lane

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/the-geniepoint-network-cumbria-county-council-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 4 Oct 2020).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
