GeniePoint · EV charging site
Dolcoath Council Offices Camborne
Dolcoath Avenue, Camborne, TR14 8SX
Dolcoath Council Offices Camborne is an EV charging site in Camborne, Cornwall, run by GeniePoint. Both of its sockets are 22 kW Type 2. 11 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Camborne (Fastned), 0.8 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- GeniePoint
- Opening hours
- Not published
- Access
- Public
- Payment
- Pay at the charger (from Open Charge Map)
- Phone (from Open Charge Map)
- +44 800 999 4240
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Dolcoath Council Offices Camborne (GeniePoint)?
Up to 22 kW AC via Type 2.
How many charging sockets does Dolcoath Council Offices Camborne (GeniePoint) have?
2 charging sockets: 1 × 22 kW Type 2, 1 × 22 kW Type 2.
Who operates Dolcoath Council Offices Camborne?
Dolcoath Council Offices Camborne is on the GeniePoint network. For site issues, the operator lists +44 800 999 4240.
Where is the nearest charger with 50 kW or more to Dolcoath Council Offices Camborne (GeniePoint)?
Camborne (Fastned) is 0.8 miles away in a straight line, with up to 300 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Dolcoath Council Offices Camborne (GeniePoint)?
A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Dolcoath Council Offices Camborne (GeniePoint)?
A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Dolcoath Council Offices Camborne (GeniePoint)?
A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Dolcoath Council Offices - Camborne - Cornwall
- Pod Point Tesco Superstore - Camborne
- The Lowenac Hotel
- Camborne
- Copper Coast, Camborne
- Pod Point Tesco Extra - Redruth
- Cheapest nearby
- Pod Point Tesco Superstore - Camborne · 44.4p per kWh · 7 kW · 0.2 mi
- Fastest nearby
- Camborne · 300 kW · 0.8 mi