GeniePoint · EV charging site
ESSO Bridge Road, Farnborough
Bridge Road, Farnborough, GU14 0HS
ESSO Bridge Road, Farnborough is an EV charging site in Farnborough, Hampshire, run by GeniePoint. It has a single socket, with CHAdeMO and CCS at up to 50 kW. 7 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Meads Shopping Centre, Ground Floor, Farnborough (Osprey Charging), 0.7 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- GeniePoint
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- £1.00 + £0.30/kWh; £10.00 overstay after 65 mins(from Open Charge Map, 2 Nov 2018)
- Phone (from Open Charge Map)
- +44 800 999 4240
- Getting there
- ESSO filling station
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at ESSO Bridge Road, Farnborough (GeniePoint)?
The listed price is £1.00 + £0.30/kWh; £10.00 overstay after 65 mins. Prices can change, so check the price at the charger before you start.
How fast is charging at ESSO Bridge Road, Farnborough (GeniePoint)?
Up to 50 kW DC via CHAdeMO, Type 2, CCS.
How many charging sockets does ESSO Bridge Road, Farnborough (GeniePoint) have?
1 charging socket: 1 × 50 kW CHAdeMO, 1 × 43 kW Type 2, 1 × 50 kW CCS.
Who operates ESSO Bridge Road, Farnborough?
ESSO Bridge Road, Farnborough is on the GeniePoint network. For site issues, the operator lists +44 800 999 4240.
Where is the nearest other charger with 50 kW or more to ESSO Bridge Road, Farnborough (GeniePoint)?
Meads Shopping Centre, Ground Floor, Farnborough (Osprey Charging) is 0.7 miles away in a straight line, with up to 80 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at ESSO Bridge Road, Farnborough (GeniePoint)?
A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at ESSO Bridge Road, Farnborough (GeniePoint)?
A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at ESSO Bridge Road, Farnborough (GeniePoint)?
A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- 1 Meadow Gate Avenue
- Meads Shopping Centre, Ground Floor, Farnborough
- Costa Coffee
- Queensmead Car Park
- Sarsen Stones, Farnborough
- Farnborough Business Park
- Cheapest nearby
- Meads Shopping Centre, Ground Floor, Farnborough · 89p per kWh · 80 kW · 0.7 mi
- Fastest nearby
- Costa Coffee · 120 kW · 0.7 mi