GeniePoint · EV charging site
Ford Reception
Ford Dunton Technical Centre, Basildon, SS15 6EE
Ford Reception is an EV charging site in Basildon, Essex, run by GeniePoint. It has a single 7 kW Type 2 socket, and the price is listed as £0.50 + £0.14/kWh. 3 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Noak Bridge (Laindon) (evyve), 1.5 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- GeniePoint
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- £0.50 + £0.14/kWh(from Open Charge Map, 11 Oct 2020)
- Phone (from Open Charge Map)
- +44 800 999 4240
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Ford Reception (GeniePoint)?
The listed price is £0.50 + £0.14/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at Ford Reception (GeniePoint)?
Up to 7 kW AC via Type 2.
How many charging sockets does Ford Reception (GeniePoint) have?
1 charging socket: 1 × 7 kW Type 2.
Who operates Ford Reception?
Ford Reception is on the GeniePoint network. For site issues, the operator lists +44 800 999 4240.
Where is the nearest charger with 50 kW or more to Ford Reception (GeniePoint)?
Noak Bridge (Laindon) (evyve) is 1.5 miles away in a straight line, with up to 75 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Ford Reception (GeniePoint)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Ford Reception (GeniePoint)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Ford Reception (GeniePoint)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Ford Motor Company
- Car Park D Ford Dunton Technical Centre
- Laindon
- West Mayne
- Pod Point Tesco Superstore - Basildon Langdon Hills
- Noak Bridge (Laindon)
- Cheapest nearby
- Pod Point Tesco Superstore - Basildon Langdon Hills · 44.4p per kWh · 7 kW · 1.1 mi
- Fastest nearby
- Noak Bridge (Laindon) · 75 kW · 1.5 mi