GeniePoint · EV charging site
KFC & Starbucks
Bath Road, Heston, TW6 2AA
KFC & Starbucks is an EV charging site in Heston, Greater London, run by GeniePoint. Its 3 sockets reach up to 50 kW, with CHAdeMO and CCS at the top speed. 14 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Q-Park Heathrow (BP Pulse), 0.3 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- GeniePoint
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- £1.80 + £0.30/kWh; £10.00 overstay after 65 mins(from Open Charge Map, 30 Dec 2020)
- Phone (from Open Charge Map)
- +44 800 999 4240
- Getting there
- max stay 1.5 hour
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at KFC & Starbucks (GeniePoint)?
The listed price is £1.80 + £0.30/kWh; £10.00 overstay after 65 mins. Prices can change, so check the price at the charger before you start.
How fast is charging at KFC & Starbucks (GeniePoint)?
Up to 50 kW DC via CHAdeMO, Type 2, CCS.
How many charging sockets does KFC & Starbucks (GeniePoint) have?
3 charging sockets: 1 × 50 kW CHAdeMO, 3 × 22 kW Type 2, 1 × 50 kW CCS.
Who operates KFC & Starbucks?
KFC & Starbucks is on the GeniePoint network. For site issues, the operator lists +44 800 999 4240.
Where is the nearest other charger with 50 kW or more to KFC & Starbucks (GeniePoint)?
Q-Park Heathrow (BP Pulse) is 0.3 miles away in a straight line, with up to 300 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at KFC & Starbucks (GeniePoint)?
A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at KFC & Starbucks (GeniePoint)?
A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at KFC & Starbucks (GeniePoint)?
A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Bath Road Car Park
- Pod Point Moxy London Heathrow Airport
- Premier Inn Heathrow
- Q-Park Heathrow
- Community Cl
- DRAX00212
- Cheapest nearby
- Pod Point Moxy London Heathrow Airport · Free · 7 kW · 0.2 mi
- Fastest nearby
- Q-Park Heathrow · 300 kW · 0.3 mi