# Lairaige Multi Storey Car Park · GeniePoint

Web page: https://ampmap.co.uk/charger/the-geniepoint-network-lairaige-multi-storey-car-park-uk

Lairaige Multi Storey Car Park is an EV charging site in Hitchin, Hertfordshire, run by GeniePoint. Both of its sockets are 7 kW Type 2, and the price is listed as Â£0.00 + Â£0.30/kWh.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** Bedford Road, SG5 2JT
- **Area:** Hitchin, Hertfordshire, United Kingdom
- **Coordinates (latitude, longitude):** 51.94910, -0.28076
- **Getting there:** On level 1. Car park open Mo-Su 07:00-19:00 BHo Closed

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| Type 2 | 7 kW | 2 | Not listed |

- **Price:** Â£0.00 + Â£0.30/kWh (from Open Charge Map)

## Site information

- **Operator:** GeniePoint
- **Opening hours:** Not published
- **Access:** Public · membership required · access key required

## Common questions

### How much does it cost to charge at Lairaige Multi Storey Car Park (GeniePoint)?

The listed price is Â£0.00 + Â£0.30/kWh. Prices can change, so check the price at the charger before you start.

### How fast is charging at Lairaige Multi Storey Car Park (GeniePoint)?

Up to 7 kW AC via Type 2.

### How many charging sockets does Lairaige Multi Storey Car Park (GeniePoint) have?

2 charging sockets: 2 × 7 kW Type 2.

### Who operates Lairaige Multi Storey Car Park?

Lairaige Multi Storey Car Park is on the GeniePoint network. For site issues, the operator lists +44 800 999 4240.

### How long does a Tesla Model Y Long Range take to charge at Lairaige Multi Storey Car Park (GeniePoint)?

A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Lairaige Multi Storey Car Park (GeniePoint)?

A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Lairaige Multi Storey Car Park (GeniePoint)?

A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Hitchin](https://ampmap.co.uk/chargers/united-kingdom/hertfordshire/hitchin)
- [GeniePoint chargers](https://ampmap.co.uk/networks/geniepoint)

## Chargers near this site

- [Lairage Car Park](https://ampmap.co.uk/charger/lairage-car-park-uk) - Type 2 7 kW · Bedford Road
- [Lairaige Multi Storey Carpark · GeniePoint](https://ampmap.co.uk/charger/the-geniepoint-network-lairaige-multi-storey-carpark-uk) - Type 2 7 kW · Lairaige Multi Storey Carpark
- [Shell Recharge EV Waitrose - Hitchin](https://ampmap.co.uk/charger/shell-recharge-ev-waitrose-hitchin-uk) - CCS 150 kW, CHAdeMO 75 kW · The Lairage, Bedford Rd · From 79p/kWh
- [Woodside Carpark Walsworth · GeniePoint](https://ampmap.co.uk/charger/the-geniepoint-network-woodside-carpark-walsworth-uk) - Type 2 7 kW · Woodside Carpark Walsworth
- [Woodside Car Park](https://ampmap.co.uk/charger/woodside-car-park-uk) - Type 2 7 kW · Walsworth Road
- [Oakfield SF Connect · BP Pulse](https://ampmap.co.uk/charger/bp-pulse-bp-oakfield-sf-connect-uk) - CCS 150 kW · Stevenage Road

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/the-geniepoint-network-lairaige-multi-storey-car-park-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 2 Nov 2018).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
