GeniePoint · EV charging site
LeicestershireCC
Ashby Road, Coalville, LE673LN
LeicestershireCC is an EV charging site in Coalville, Leicestershire, run by GeniePoint. All 8 of its sockets are 22 kW Type 2. 2 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Morrisons (GeniePoint), 0.7 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- GeniePoint
- Opening hours
- Not published
- Access
- Public
- Payment
- Pay at the charger (from Open Charge Map)
- Phone (from Open Charge Map)
- +44 800 999 4240
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at LeicestershireCC (GeniePoint)?
Up to 22 kW AC via Type 2.
How many charging sockets does LeicestershireCC (GeniePoint) have?
8 charging sockets: 1 × 22 kW Type 2, 1 × 22 kW Type 2, 1 × 22 kW Type 2, 1 × 22 kW Type 2, 1 × 22 kW Type 2, 1 × 22 kW Type 2, 1 × 22 kW Type 2, 1 × 22 kW Type 2.
Who operates LeicestershireCC?
LeicestershireCC is on the GeniePoint network. For site issues, the operator lists +44 800 999 4240.
Where is the nearest charger with 50 kW or more to LeicestershireCC (GeniePoint)?
Morrisons (GeniePoint) is 0.7 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at LeicestershireCC (GeniePoint)?
A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at LeicestershireCC (GeniePoint)?
A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at LeicestershireCC (GeniePoint)?
A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Pod Point Margaret Street Car Park
- Morrisons
- Pod Point Vicarage Street Car Park
- Pod Point The Green Car Park
- Pod Point Greenstone Primary School
- Pod Point High Street Car Park
- Cheapest nearby
- Pod Point Greenstone Primary School · Free · 7 kW · 2.4 mi
- Fastest nearby
- Morrisons · 50 kW · 0.7 mi