# Market Rasen Leisure Centre · GeniePoint

Web page: https://ampmap.co.uk/charger/the-geniepoint-network-market-rasen-leisure-centre-uk

Market Rasen Leisure Centre is an EV charging site in Market Rasen, Lincolnshire, run by GeniePoint. It has a single 22 kW Type 2 socket, and the price is listed as AC socket 50p fee then 30p per kWh.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** Gainsborough Road, LN8 3JW
- **Area:** Market Rasen, Lincolnshire, United Kingdom
- **Coordinates (latitude, longitude):** 53.38777, -0.34331

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| Type 2 | 22 kW | 2 | Not listed |

- **Price:** AC socket 50p fee then 30p per kWh (from Open Charge Map)

## Site information

- **Operator:** GeniePoint
- **Opening hours:** Not published
- **Access:** Public · membership required · access key required

## Common questions

### How much does it cost to charge at Market Rasen Leisure Centre (GeniePoint)?

The listed price is AC socket 50p fee then 30p per kWh. Prices can change, so check the price at the charger before you start.

### How fast is charging at Market Rasen Leisure Centre (GeniePoint)?

Up to 22 kW AC via Type 2.

### How many charging sockets does Market Rasen Leisure Centre (GeniePoint) have?

1 charging socket: 2 × 22 kW Type 2.

### Who operates Market Rasen Leisure Centre?

Market Rasen Leisure Centre is on the GeniePoint network. For site issues, the operator lists +44 800 999 4240.

### How long does a Tesla Model Y Long Range take to charge at Market Rasen Leisure Centre (GeniePoint)?

A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Market Rasen Leisure Centre (GeniePoint)?

A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Market Rasen Leisure Centre (GeniePoint)?

A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Market Rasen](https://ampmap.co.uk/chargers/united-kingdom/lincolnshire/market-rasen)
- [GeniePoint chargers](https://ampmap.co.uk/networks/geniepoint)

## Chargers near this site

- [Market Rasen Leisure Centre · GeniePoint](https://ampmap.co.uk/charger/the-geniepoint-network-market-rasen-leisure-centre-2-uk) - Type 2 22 kW · Market Rasen Dry Leisure Centr
- [Pod Point Tesco Superstore - Market Rasen](https://ampmap.co.uk/charger/pod-point-tesco-superstore-market-rasen-uk) - Type 2 7 kW · Linwood Road · From 44.4p/kWh

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/the-geniepoint-network-market-rasen-leisure-centre-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 28 Feb 2021).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
