GeniePoint · EV charging site
MFG BP Bedfont
Staines Road, Feltham, TW14 8PA
MFG BP Bedfont is an EV charging site in Feltham, Greater London, run by GeniePoint. It has a single socket, with CHAdeMO and CCS at up to 50 kW, and the price is listed as £1.00 + £0.30/kWh. 7 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Bethany Waye Car Park (BP Pulse), 0.4 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- GeniePoint
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- £1.00 + £0.30/kWh(from Open Charge Map, 7 Oct 2020)
- Phone (from Open Charge Map)
- +44 800 999 4240
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at MFG BP Bedfont (GeniePoint)?
The listed price is £1.00 + £0.30/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at MFG BP Bedfont (GeniePoint)?
Up to 50 kW DC via Type 2, CHAdeMO, CCS.
How many charging sockets does MFG BP Bedfont (GeniePoint) have?
1 charging socket: 1 × 43 kW Type 2, 1 × 50 kW CHAdeMO, 1 × 50 kW CCS.
Who operates MFG BP Bedfont?
MFG BP Bedfont is on the GeniePoint network. For site issues, the operator lists +44 800 999 4240.
Where is the nearest other charger with 50 kW or more to MFG BP Bedfont (GeniePoint)?
Bethany Waye Car Park (BP Pulse) is 0.4 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at MFG BP Bedfont (GeniePoint)?
A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at MFG BP Bedfont (GeniePoint)?
A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at MFG BP Bedfont (GeniePoint)?
A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Bolloré Logistics Heathrow
- Bethany Waye Car Park
- Premier Inn Terminal 4
- Raleigh Road
- ubitricity Distributed Energy Systems UK Ltd. 24 Raleigh Road, Outside No 24
- Raleigh Road
- Cheapest nearby
- ubitricity Distributed Energy Systems UK Ltd. 24 Raleigh Road, Outside No 24 · 56p per kWh · 5 kW · 0.9 mi