# MFG BP Great Barr · GeniePoint

Web page: https://ampmap.co.uk/charger/the-geniepoint-network-mfg-bp-great-barr-uk

MFG BP Great Barr is an EV charging site in Walsall, run by GeniePoint. It has a single socket, with CHAdeMO and CCS at up to 50 kW, and the price is listed as Â£1.00 + Â£0.30/kWh.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** Birmingham Road, B43 6NT
- **Area:** Walsall, United Kingdom
- **Coordinates (latitude, longitude):** 52.55063, -1.93538

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| CCS | 50 kW | 1 | Not listed |
| CHAdeMO | 50 kW | 1 | Not listed |
| Type 2 | 43 kW | 1 | Not listed |

- **Price:** Â£1.00 + Â£0.30/kWh (from Open Charge Map)

## Site information

- **Operator:** GeniePoint
- **Opening hours:** Not published
- **Access:** Public · membership required · access key required

## Common questions

### How much does it cost to charge at MFG BP Great Barr (GeniePoint)?

The listed price is Â£1.00 + Â£0.30/kWh. Prices can change, so check the price at the charger before you start.

### How fast is charging at MFG BP Great Barr (GeniePoint)?

Up to 50 kW DC via Type 2, CHAdeMO, CCS.

### How many charging sockets does MFG BP Great Barr (GeniePoint) have?

1 charging socket: 1 × 43 kW Type 2, 1 × 50 kW CHAdeMO, 1 × 50 kW CCS.

### Who operates MFG BP Great Barr?

MFG BP Great Barr is on the GeniePoint network. For site issues, the operator lists +44 800 999 4240.

### How long does a Tesla Model Y Long Range take to charge at MFG BP Great Barr (GeniePoint)?

A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at MFG BP Great Barr (GeniePoint)?

A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at MFG BP Great Barr (GeniePoint)?

A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Walsall](https://ampmap.co.uk/chargers/united-kingdom/walsall/walsall)
- [GeniePoint chargers](https://ampmap.co.uk/networks/geniepoint)

## Chargers near this site

- [BP Great Barr · GeniePoint](https://ampmap.co.uk/charger/the-geniepoint-network-bp-great-barr-uk) - CHAdeMO 50 kW, Type 2 50 kW · 76 Birmingham Road
- [Holiday Inn Birmingham · POGO](https://ampmap.co.uk/charger/pogo-holiday-inn-birmingham-uk) - CCS 200 kW, Type 2 7 kW · Holiday Inn Birmingham · From 56p/kWh
- [Shell Recharge Shell Birmingham Road](https://ampmap.co.uk/charger/shell-recharge-shell-birmingham-road-uk) - CCS / CHAdeMO 180 kW · 333 Birmingham Road, Great Barr · From 85p/kWh
- [The Malt Shovel · BP Pulse](https://ampmap.co.uk/charger/bp-pulse-the-malt-shovel-2-uk) - CCS 50 kW · The Malt Shovel, Newton Road
- [Bcfa Bcfa · ChargePoint](https://ampmap.co.uk/charger/chargepoint-bcfa-bcfa-uk) - Type 2 22 kW · Ray Hall Ln
- [ubitricity Distributed Energy Systems UK Ltd. 308 Rocky Lane](https://ampmap.co.uk/charger/ubitricity-308-rocky-lane-uk) - Ubitricity · Type 2 5 kW · 308 Rocky Lane · From 45p/kWh

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/the-geniepoint-network-mfg-bp-great-barr-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 6 Mar 2019).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
