GeniePoint · EV charging site
MFG BP Royal Oak Wednesfield
Blackhalve Lane, Wednesfield, WV11 1BQ
MFG BP Royal Oak Wednesfield is an EV charging site in Wednesfield, Wolverhampton, run by GeniePoint. It has a single socket, with CHAdeMO and CCS at up to 50 kW, and the price is listed as ã1.00 + ã0.30/kWh. 1 other charging site is listed within a mile, and the nearest other site with 50 kW or more is Store Car Park - Raynor Parade (POGO), 0.7 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- GeniePoint
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- ã1.00 + ã0.30/kWh(from Open Charge Map, 14 Nov 2018)
- Phone (from Open Charge Map)
- +44 800 999 4240
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at MFG BP Royal Oak Wednesfield (GeniePoint)?
The listed price is ã1.00 + ã0.30/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at MFG BP Royal Oak Wednesfield (GeniePoint)?
Up to 50 kW DC via Type 2, CHAdeMO, CCS.
How many charging sockets does MFG BP Royal Oak Wednesfield (GeniePoint) have?
1 charging socket: 1 × 43 kW Type 2, 1 × 50 kW CHAdeMO, 1 × 50 kW CCS.
Who operates MFG BP Royal Oak Wednesfield?
MFG BP Royal Oak Wednesfield is on the GeniePoint network. For site issues, the operator lists +44 800 999 4240.
Where is the nearest other charger with 50 kW or more to MFG BP Royal Oak Wednesfield (GeniePoint)?
Store Car Park - Raynor Parade (POGO) is 0.7 miles away in a straight line, with up to 150 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at MFG BP Royal Oak Wednesfield (GeniePoint)?
A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at MFG BP Royal Oak Wednesfield (GeniePoint)?
A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at MFG BP Royal Oak Wednesfield (GeniePoint)?
A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Store Car Park - Raynor Parade
- Steelpark Way
- Moreton Arms, Wolverhampton
- PremierInn
- Broadway (Short Heath)
- Pod Point LNWMR - Wolverhampton Station
- Cheapest nearby
- Pod Point LNWMR - Wolverhampton Station · 42p per kWh · 7 kW · 2.1 mi
- Fastest nearby
- Store Car Park - Raynor Parade · 150 kW · 0.7 mi