GeniePoint · EV charging site
MFG Shell-Wittering
A1 Great North Road, Stamford, PE8 6HA
MFG Shell-Wittering is an EV charging site in Stamford, Lincolnshire, run by GeniePoint. Its 2 sockets reach up to 50 kW, with CHAdeMO and CCS at the top speed, and the price is listed as £1.00 + £0.30/kWh. No other charging site is listed within a mile, and the nearest other site with 50 kW or more is Morrison's Stamford (GeniePoint), 4.3 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- GeniePoint
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- £1.00 + £0.30/kWh(from Open Charge Map, 30 Sept 2020)
- Phone (from Open Charge Map)
- +44 800 999 4240
- Notes
- Type 2 is 50p + 30p/kWh and is a socket not tethered.
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at MFG Shell-Wittering (GeniePoint)?
The listed price is £1.00 + £0.30/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at MFG Shell-Wittering (GeniePoint)?
Up to 50 kW DC via Type 2, CHAdeMO, CCS.
How many charging sockets does MFG Shell-Wittering (GeniePoint) have?
2 charging sockets: 1 × 43 kW Type 2, 1 × 50 kW CHAdeMO, 1 × 50 kW CCS.
Who operates MFG Shell-Wittering?
MFG Shell-Wittering is on the GeniePoint network. For site issues, the operator lists +44 800 999 4240.
Where is the nearest other charger with 50 kW or more to MFG Shell-Wittering (GeniePoint)?
Morrison's Stamford (GeniePoint) is 4.3 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at MFG Shell-Wittering (GeniePoint)?
A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at MFG Shell-Wittering (GeniePoint)?
A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at MFG Shell-Wittering (GeniePoint)?
A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Cheapest nearby
- Pod Point Rockingham Forest Park · 57.6p per kWh · 7 kW · 2.4 mi