GeniePoint · EV charging site
MFG Texaco Ninian
Sloper Road, Cardiff, CF11 8BN
MFG Texaco Ninian is an EV charging site in Cardiff, run by GeniePoint. It has a single socket, with CHAdeMO and CCS at up to 50 kW, and the price is listed as £1.00 + £0.30/kWh. 10 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Wessex Garages Cardiff, 0.3 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- GeniePoint
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- £1.00 + £0.30/kWh(from Open Charge Map, 23 Jan 2019)
- Phone (from Open Charge Map)
- +44 800 999 4240
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at MFG Texaco Ninian (GeniePoint)?
The listed price is £1.00 + £0.30/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at MFG Texaco Ninian (GeniePoint)?
Up to 50 kW DC via Type 2, CHAdeMO, CCS.
How many charging sockets does MFG Texaco Ninian (GeniePoint) have?
1 charging socket: 1 × 43 kW Type 2, 1 × 50 kW CHAdeMO, 1 × 50 kW CCS.
Who operates MFG Texaco Ninian?
MFG Texaco Ninian is on the GeniePoint network. For site issues, the operator lists +44 800 999 4240.
Where is the nearest other charger with 50 kW or more to MFG Texaco Ninian (GeniePoint)?
Wessex Garages Cardiff is 0.3 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at MFG Texaco Ninian (GeniePoint)?
A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at MFG Texaco Ninian (GeniePoint)?
A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at MFG Texaco Ninian (GeniePoint)?
A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Wessex Garages Cardiff
- Capital Shopping Park, Cardiff
- Wessex Garages Cardiff
- Redlaver Street
- Mardy Street
- EH - IKEA Cardiff
- Cheapest nearby
- EH - IKEA Cardiff · 85p per kWh · 50 kW · 0.6 mi
- Fastest nearby
- Capital Shopping Park, Cardiff · 300 kW · 0.5 mi