GeniePoint · EV charging site
MFG Texaco Parkside
Icknield Port Road, Smethwick, B16 0BJ
MFG Texaco Parkside is an EV charging site in Smethwick, Sandwell, run by GeniePoint. It has a single socket, with CHAdeMO and CCS at up to 50 kW. 47 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Pod Point Tesco Superstore - Birmingham Springhill, 0.7 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- GeniePoint
- Opening hours
- Not published
- Access
- Public
- Payment
- Pay at the charger (from Open Charge Map)
- Price
- £1.00 + £0.30/kWh. £10.00 overstay after 65 mins(from Open Charge Map, 2 Nov 2018)
- Phone (from Open Charge Map)
- +44 800 999 4240
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at MFG Texaco Parkside (GeniePoint)?
The listed price is £1.00 + £0.30/kWh. £10.00 overstay after 65 mins. Prices can change, so check the price at the charger before you start.
How fast is charging at MFG Texaco Parkside (GeniePoint)?
Up to 50 kW DC via CHAdeMO, CCS, Type 2.
How many charging sockets does MFG Texaco Parkside (GeniePoint) have?
1 charging socket: 1 × 50 kW CHAdeMO, 1 × 50 kW CCS, 1 × 43 kW Type 2.
Who operates MFG Texaco Parkside?
MFG Texaco Parkside is on the GeniePoint network. For site issues, the operator lists +44 800 999 4240.
Where is the nearest other charger with 50 kW or more to MFG Texaco Parkside (GeniePoint)?
Pod Point Tesco Superstore - Birmingham Springhill is 0.7 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at MFG Texaco Parkside (GeniePoint)?
A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at MFG Texaco Parkside (GeniePoint)?
A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at MFG Texaco Parkside (GeniePoint)?
A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- ubitricity Distributed Energy Systems UK Ltd. 24 Summerfield Crescent
- ubitricity Distributed Energy Systems UK Ltd. 100 Barford Road, Opp.
- ubitricity Distributed Energy Systems UK Ltd. 1 Summerfield Crescent
- ubitricity Distributed Energy Systems UK Ltd. 67 Barford Road, Opp. school, Opp. school
- ubitricity Distributed Energy Systems UK Ltd. 54 Coplow Street
- ubitricity Distributed Energy Systems UK Ltd. 33 Barford Road, Opp., Opp.
- Cheapest nearby
- ubitricity Distributed Energy Systems UK Ltd. 24 Summerfield Crescent · 45p per kWh · 5 kW · 110 yd